28
Energy-Recovery Ventilation
System Service Manual
4 DISASSEMBLY AND ASSEMBLY PROCEDURE OF MAIN PARTS
Picture
Name
Function
Acentric Motor Sub-Assy.
0DNHWKHDLUÀRZ
Heat Exchange core.
The important Sub-Assy that make the
fresh air and room air exchange energy.
4.1 Main parts introduce
Main parts dismantle and install
Name: Service door’s teardown
Fig. show
Discharge the two bolts on the
right of the Service door, and
then take down the buckle.
Bolt
Name: Electric Box’s teardown
Fig. show
Summary of Contents for FHBQ-D10-K
Page 3: ...1 Energy Recovery Ventilation System Service Manual PRODUCT QSPEVDU ...
Page 8: ...6 Energy Recovery Ventilation System Service Manual CONTROL DPOUSPM ...
Page 19: ...17 Energy Recovery Ventilation System Service Manual INSTALLATION ...
Page 25: ...23 Energy Recovery Ventilation System Service Manual MAINTENANCE ...
Page 38: ...36 Energy Recovery Ventilation System Service Manual Model FHBQ D30 M Exploded View ...