29
Energy-Recovery Ventilation
System Service Manual
Remove the two bolts and then
circumgyrate the Electric Box to open it.
Bolt
Capacitance
Name:Change the heat
H[FKDQJHFRUHDQG¿OWHU
Fig. show
After removing the service door, we could
EHDEOHWRWDNHRXWWKHFRUHDQGWKH¿OWHU
The core should be washed by
cleaner or other special dust catcher
HTXLSPHQWVH[FHSWZDWHU
Heat Exchange core
Filter
Name: Motor Sub-Assy’s teardown
Fig. show
1.Opening the top cover;
Take out the core and the
¿OWHUEHIRUHKDQG
Air path foam
Motor Sub-Assy
5HPRYHWKHEROWDVWKH¿JVKRZ
DQGWDNHRXWWKH¿[LQJERDUGDVV\
3. Take out the air path foam;
'LVHQWZLQHWKHQXWWKDWXVHGWR¿[WKH
fan and pedestal; Remove the bolt that
XVHGWR¿[WKHIDQDQGVLGHSDQHO
Bolt
Summary of Contents for FHBQ-D10-K
Page 3: ...1 Energy Recovery Ventilation System Service Manual PRODUCT QSPEVDU ...
Page 8: ...6 Energy Recovery Ventilation System Service Manual CONTROL DPOUSPM ...
Page 19: ...17 Energy Recovery Ventilation System Service Manual INSTALLATION ...
Page 25: ...23 Energy Recovery Ventilation System Service Manual MAINTENANCE ...
Page 38: ...36 Energy Recovery Ventilation System Service Manual Model FHBQ D30 M Exploded View ...