Three-Phase UPS (10kVA-160kVA) Series
User Manual
3 Installation
41
Inspect the appearance of the UPS and check if there has any damage caused by transportation. If
damaged, please inform the carrier immediately.
Compare with the packing list and check if the accessories mode is complete and proper. If the
accessories lack or model wrong, please take note and contact the Company or local agency of
our company.
Step 5
After checking, unscrew the bolts that connected with device and wooden bracket by socket wrench,
the bolt position is as shown in Figure3-5, Figure3-6 and Figure3-7.
Figure3-5
Bolt position of Three-Phase (10kVA-30kVA) series UPS