Three-Phase UPS (10kVA-160kVA) Series
User Manual
3 Installation
31
3 Installation
This chapter introduces the installation for the UPS, including installation preparation, unpacking and
checking, installation process, mechanical installation, electrical connection, etc.
Only trained professionals who are with high voltage and AC qualification can install UPS.
UPS is just suitable to install on the flat ground that is concrete or non-flammable.
3.1 Installation Annuncements
When installing the UPS, please check whether the grid feeding circuit of UPS is unblocked,
including the connection of all contacts and sockets, which is to avoid open circuit or short
circuit.
While wiring, don't reversely or wrongly connect the neutral wire, live wire and ground wire in
the input and output, avoid short circuit. Meanwhile, measure the mains voltage and see if the
voltage is normal.
When installing the batteries, please connect the battery according to the installation instruction.
The wires must be fastened. It is strictly forbidden to short circuit the anode and cathode of the
battery or touch any two wiring pillars or bare wire, otherwise, it may cause battery damage or
human injury. When connect the battery to the UPS, please ensure that the settings on the battery
manage page of touch screen (see
) is in accordance with real battery
amount, equalized charge/ floating charge voltage etc.
UPS installation requirements:
−
Put the UPS on the flat floor and keep it upright (Do not tilt or put it on the uneven floor).
−
Don't put things onto the UPS or someone sit on it.
−
Keep the UPS away from the direct sunlight, rain or wet environment.