Three-Phase UPS (10kVA-160kVA) Series
User Manual
3 Installation
47
Bolt
Spring gasket
Flat gasket
Expansion tube
1. Drill holes on the installation ground by hammer drill.
2. Tighten The expansion bolts mildly, and put it to the
hole vertically, and then knock the expansion bolt by
rubber hammer till all the expansion tube into the hole.
3. Pre tighten the expansion bolt.
4.Screw out the bolt , take down the spring gasket and
flat gasket.
Figure3-15
Expansion bolt structure and installation
The expansion tube shouldn’t be higher than the ground, which is to avoid affecting the cabinet
installation.
The exposed height of expansion bolt must be within 50mm.
Step 4
Fasten UPS.
Three-Phase (10kVA-30kVA) series UPS
1.
Rotate four supporting foots of universal wheel clockwise by wrench to separate anchor frame
from wooden frame. Dismantle anchor frame and install it in the mounted expansion bolts.
Figure3-16
Rotate four supporting foot