www.GreenSeriesFitness.com
©April 2017
Call Toll free at (800) 269-7130
CIR-RB7000-G1 Revision 1.2
12
UNPACKING & ASSEMBLY
Step4: Assemble main frame and handle bar post.
1).Take front cover joint into handle bar post.
2).Take the console wire, heart rate wire, AIR wire and CABLE wire through handle bar post.
X1
#4-7
#4-8
X1