background image

INSTALLATION INSTRUCTIONS

 

Model: 

Name: 

During installation, please be sure to also refer to guidelines in Greenfields’ Preliminary Instructions document. 

© 2015 Greenfields Outdoor Fitness, Inc. 

In order to honor our commitment to quality and safety, Greenfields Outdoor Fitness reserves the right to make changes and revise the design specifications without notice.

Questions? Please call 

888-315-9037 x105

Dimensions

Greenfields installation instructions:

1. All units MUST be fully assembled, 

leveled, and braced in place in the foot

-

ing hole before any concrete is poured.

2. A monolithic pour MUST be used for 

concrete. (All concrete must be poured 

at one time)

3. Concrete requirement: 3250 psi or better.

4. The top of the blue tape attached to the posts on the 

equipment is final top surface level.

5. All screws must be attached using LocTite.

6. It is recommended to wait a minimum of one week 

after concrete is poured before equipment is used.

7. The use of Decomposed Granite Surfacing (DG) is known 

to accelerate normal wear & tear of footrests.

 GR2005-1-71

 3-Person Static Combo

This unit ships in 4 separately wrapped components.

24"

24"

24"

24"

20"

20"

20"

62"

52"

Optional Top

Surfacing

Surface

Level

24"

24"

24" 20"

4" under

concrete

84"

Recommended Height

Finished product

Summary of Contents for GR2005-1-104

Page 1: ...ll help ensure an accurate safe and problem free installation SUGGESTED MATERIALS Area should be fenced recommend 6 temporary fencing entire perimeter Ground should be thoroughly graded and finished grade accurately established using either laser or string line methods Prior to digging entire site should be laid out with all footings clearly marked as per plans In the U S contact Dig Alert for cle...

Page 2: ...ch unit Make sure all units are plumb and leveled Adhere to surfacing level marked on units with blue tape Pour concrete Clear concrete residue from post and other parts Let concrete dry It is recommended to wait a minimum of one week after concrete is poured before equipment is used Remove supports Touch up units using attached guide Wrap units in black tarps until open to public At the end of in...

Page 3: ...tself Units are heavy and bulky and will require 2 4 people to handle Make sure a forkli with long forks is available All units have been inspected before final packing however please review the packing slip to ensure that all pieces are present If anything is missing call 888 315 9037 x105 immediately Save all paperwork for future reference INSTRUCTIONS TIPS FROM GREENFIELDS OUTDOOR FITNESS deliv...

Page 4: ...aint is provided in the enclosed toolbox If missing parts or damaged items are no ced during installa on or should any assistance be required please contact Greenfields immediately at 888 315 9037 x105 At the end of installa on toolbox and all documenta on should be submi ed to the local maintenance staff installation ...

Page 5: ...ed 2 A monolithic pour MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one week after concrete is poured before equipment is used 7 The use of Decomposed Granite ...

Page 6: ...g 2X4s 5 Stake the clamping 2X4s to the ground on each side of the unit 6 With magnetic level make sure both pipes are plumb Then attach a balancing 2X4 kicker to the top portion of the unit with tie wire and stake the other end to the ground If needed for stability a second 2X4 may be attached and staked in a different direction 7 Place metal pegs rebar through prepared holes in embedded pipe 8 P...

Page 7: ...oncrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one week after concrete is poured before equipment is used 7 The use of Decomposed Granite Surfacing DG is known to accelerate normal wear tear o...

Page 8: ...ith blue tape are correct height Pieces of cinder block may be placed directly under the legs and or wooden blocks and shims may be placed under the extending 2X4s GR2005 1 26 2 Person Cross Country Ski 5 Use magnetic level to check that both sides are plumb 6 Place metal pegs rebar through prepared holes in embedded pipe 7 Pour concrete into footings Use vibration or thorough shovel mixing to ens...

Page 9: ...concrete is poured 2 A monolithic pour MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one week after concrete is poured before equipment is used 7 The use of Dec...

Page 10: ... the unit 6 With magnetic level make sure that the center pipe is exactly plumb Then attach a balancing 2X4 kicker to the top portion of the unit with tie wire and stake the other end to the ground GR2005 1 47 W 2 Person Accessible Vertical Press If needed for stability a second 2X4 may be attached and staked in a different direction 7 Metal stoppers should be wired in place directly under both th...

Page 11: ...nolithic pour MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one week after concrete is poured before equipment is used 7 The use of Decomposed Granite Surfacing...

Page 12: ...of the unit 7 With magnetic level make sure that the center pipe is exactly plumb Then attach a balancing 2X4 kicker to GR2005 1 48A W 2 Person Accessible Chest Press the top portion of the unit with tie wire and stake the other end to the ground If needed for stability a second 2X4 may be attached and staked in a different direction 8 Metal stoppers should be wired in place directly under both th...

Page 13: ...r MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one week after concrete is poured before equipment is used 7 The use of Decomposed Granite Surfacing DG is known...

Page 14: ...e of the unit 7 With magnetic level make sure that the center pipe is exactly plumb Then attach a balancing 2X4 kicker to GR2005 1 48 W 2 Person Accessible Lat Pull the top portion of the unit with tie wire and stake the other end to the ground If needed for stability a second 2X4 may be attached and staked in a different direction 8 Metal stoppers should be wired in place directly under both the ...

Page 15: ...t ing hole before any concrete is poured 2 A monolithic pour MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one week after concrete is poured before equipment is...

Page 16: ...laced under the clamping 2X4s 5 Stake the clamping 2X4s to the ground on each side of the unit GR2005 1 71 3 Person Static Combo 6 With magnetic level make sure both pipes are plumb Then attach a balancing 2X4 kicker to the top portion of the unit with tie wire and stake the other end to the ground If needed for stability a second 2X4 may be attached and staked in a different direction 7 Place met...

Page 17: ...ly assembled leveled and braced in place in the foot ing hole before any concrete is poured 2 A monolithic pour MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of on...

Page 18: ...the clamping 2X4s 5 Stake the clamping 2X4s to the ground on each side of the unit GR2005 1 104 4 Person Leg Press 6 With magnetic level make sure that the center pipe is exactly plumb Then attach a balancing 2X4 kicker to the top portion of the unit with tie wire and stake the other end to the ground If needed for stability a second 2X4 may be attached and staked in a different direction 7 Place ...

Page 19: ...sembled leveled and braced in place in the foot ing hole before any concrete is poured 2 A monolithic pour MUST be used for concrete All concrete must be poured at one time 3 Concrete requirement 3250 psi or better 4 The top of the blue tape attached to the posts on the equipment is final top surface level 5 All screws must be attached using LocTite 6 It is recommended to wait a minimum of one wee...

Page 20: ...ing is correct height 5 Stake the clamping 2X4s to the ground on each side of the unit GR2005 1 105 Custom Announcement Sign 6 With magnetic level make sure that the frame is exactly plumb Then attach a balancing 2X4 kicker to the top portion of the unit with tie wire and stake the other end to the ground 7 Pour concrete into footings Use vibration or thorough shovel mixing to ensure a good set ar...

Reviews: