1. Clamp two pipes of assembled unit
between two 2X4s, using all-thread, nuts
and washers.
2. Top of boards should be even with
the “finished grade” markings on pipes,
usually done with blue tape.
3. Stand unit in the prepared footing;
use laser or string-line to measure height
of unit.
4. Raise/lower unit so that “finished
grade” marking on pipes is correct height.
Pieces of cinder block may be placed
directly under the pipes and/or wooden
blocks and shims may be placed under
the clamping 2X4s.
5. Stake the clamping 2X4s to the
ground on each side of the unit.
GR2005-1-71
3-Person Static Combo
6. With magnetic level, make sure
both pipes are plumb. Then attach a
balancing 2X4 (kicker) to the top portion
of the unit with tie wire and stake the
other end to the ground. If needed for
stability, a second 2X4 may be attached
and staked in a different direction.
7. Place metal pegs/rebar through
prepared holes in embedded pipe.
8. Pour concrete into footings. Use
vibration or thorough shovel mixing to ensure
a good set around embedded pipes, and to
eliminate air pockets.
9. Depending on the type of surface to be
installed, there should be approximately 4”
between the top of the concrete and “finished