INSTALLATION INSTRUCTIONS
Model:
Name:
During installation, please be sure to also refer to guidelines in Greenfields’ Preliminary Instructions document.
© 2015 Greenfields Outdoor Fitness, Inc.
In order to honor our commitment to quality and safety, Greenfields Outdoor Fitness reserves the right to make changes and revise the design specifications without notice.
Questions? Please call
888-315-9037 x105
Dimensions
Greenfields installation instructions:
1. All units MUST be fully assembled,
leveled, and braced in place in the foot
-
ing hole before any concrete is poured.
2. A monolithic pour MUST be used for
concrete. (All concrete must be poured
at one time)
3. Concrete requirement: 3250 psi or better.
4. The top of the blue tape attached to the posts on the
equipment is final top surface level.
5. All screws must be attached using LocTite.
6. It is recommended to wait a minimum of one week
after concrete is poured before equipment is used.
7. The use of Decomposed Granite Surfacing (DG) is known
to accelerate normal wear & tear of footrests.
GR2005-1-104
4-Person Leg Press
This unit ships in 3 separately wrapped components.
30"
36"
82"
36"
36"
Finished product