VersiVent Energy Recovery Ventilator
Service Clearances
VER-45, 65 and 90 units require minimum clearances
for access on all sides for routine maintenance. Filter
replacement, drain pan inspection and cleaning, energy
wheel cassette inspection, fan bearing lubrication and
belt adjustment are examples of routine maintenance
that must be performed. Blower and motor assemblies,
energy recovery wheel cassette, coil and filter sections
are always provided with a service door or panel for
proper component access. Clearances for component
removal may be greater than the service clearances,
refer to drawings for these dimensions.
Additional clearances for units with packaged DX
Clearances must be maintained on all sides of this unit.
This especially is true with the top of this unit. Hot air is
being discharged through the condensing fans during
operation, and the more clearance available, the better
the chance of avoiding recirculation or coil starvation.
This unit should never be placed under an overhang
or inside a building. A minimum of 48 inches over the
condensing fans is recommended.
Minimum 24 inches
clearance
Condensing Coil Intake
Keep this area clear
Minimum 48 inches
clearance
Unit Clearances
Unit Size
A
B
C
D
VER-45
65
42
36
24
VER-65
70
42
36
24
VER-90
65
42
65
24
All dimensions shown in inches.
Access Panels may change depending on options
selected.
TL
TR
TR
TL
TR
TL
TR
TL
TR
TR
TL
TL
TR
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
ACCESS
PANEL
A
B
C
D
VER-90
ONLY
ACCESS PANELS MAY CHANGE DEPENDING ON OPTIONS SELECTED.
UNIT CLEARANCES
UNIT
A
B
C
D
VER-45
VER-65
VER-90
65 IN
70 IN
65 IN
42 IN
42 IN
42 IN
36 IN
36 IN
65 IN
24 IN
24 IN
24 IN