FINAL FIXING
ANCHORING BUILDING
TO SLAB / CONCRETE
BASE
FIX HERE
1.
For this final stage you will need eight No.10 X 2” screws,
eight brown wall plugs, a 7mm masonry drill bit and a
hammer drill.
2.
Fixing the greenhouse to the ground is very simple to do.
When you built the front, rear and side assemblies you will
have attached base brackets (Part number: 300) in specific
places around the building.
3.
Make sure the greenhouse structure is square (Diagonal
measurements should be equal) and level.
4.
Drill down through the holes in the base brackets into the
concrete.
5.
Insert a wall plug into each hole.
6.
Finally drive a screw into each hole.
7.
You should now go round the entire greenhouse, inside and
out, pushing on the nut caps.
8.
The last job is to insert the Ridge caps (582), these simply
push on to the ridge. You can now check the greenhouse
and look for any gaps where water might come in, fill these
using the silicone supplied.
9.
Your greenhouse is now complete.