background image

LPK1240K Hydraulic Crimping Tool

Greenlee Tools, Inc.

4455 Boeing Dr. • Rockford, IL 61109-2988 USA • 815-397-7070

7

Assembly

Refer to the illustration and parts list for the correct 

orientation and placement of parts.
Replace any O-rings, V-rings, seals, and gaskets on 

parts that have been disassembled. Apply hydraulic 

fluid or O-ring lubricant to all O-rings and all metal 

surfaces which they must slide over. When installing 

an O-ring which must slide over sharp surfaces, use a 

rolling motion and be careful not to damage the O-ring.
Wherever the assembly results in metal-to-metal 

 contact, coat the surfaces with hydraulic fluid or  

O-ring lubricant.
Some steps of the assembly procedure require a remov-

able type of thread sealing and locking compound, such 

as Loctite

®

 242

®

 or equivalent. Follow the manufactur-

er’s instructions for curing.

Cylinder and Ram 

1.  Install O-ring (10), backup ring (9), and wiper (4) 

onto the ram (2).

2.  Slide the ram assembly into the cylinder (6) until it 

bottoms out.

3.  Screw the C-head assembly (1) onto the cylinder (6) 

until the flat surface of the C-head is flush with the 

similar flat surface of the ram.

Screw the C-head to

the cylinder until these

surfaces are flush.

4.  Apply a thread locking compound to the rotational 

stop screw (5) and install it into the cylinder (6).

5.  Install ring (17), seal (18), and O-ring (24) with 

backup rings (25) onto the piston (7).

6.  Apply a thread locking compound to the screws 

(13). Install shuttle spools (11), washers (12), and 

screws (13). Remove excess compound after 

assembly and apply a thin coat of oil to the sur-

rounding area.

7.  Apply a thread locking compound to the threaded 

holes of the ram — one bead of compound along 

the entire length of the thread. Install the piston (7) 

into the cylinder (6) and secure it to the ram assem-

bly (2) using screws (51) with washers (61). Torque 

to 16.9 newton-meters (150 inch-pounds).

Handle with Cylinder Cover

  1.  Install the ball (62), ball stop (63), and retaining ring 

(64).

  2.  Install two 1/8" pipe plugs (45) into the handle (26).
  3.  Install the O-ring (24) onto the tube assembly (22). 

Slide the tube assembly into the handle (26) and 

secure it with the retaining ring (28).

  4.  Install the spool OD O-ring (38) into the handle, 

and install the spool groove O-ring (35) onto the 

spool (41). From the trigger side, install the spool 

 assembly (41) into the handle (26).

  5.  Opposite the trigger side, install the spring (37) and 

spring cap (39), and secure them with a retaining 

ring (40).

  6.  From the trigger side, install the stop washer (36) 

and retaining ring (40) into the handle.

  7.  Install the valve pin (46), spring (47), adjusting 

screw (48), copper washer (49) and cap (50) into the 

handle.

  8.  Screw the handle assembly (26) into the cover (20) 

until it is snug. Add or remove shims (21) — six 

maximum — to allow access to the stop ring adjust-

ment screws (15) and nuts (44). After installing the 

proper number of shims, install the O-ring (29). 

Reassemble using a thread locking compound on 

the threads that mate the handle to the cover.

  9.  If removed, assemble the screws (15) to the shuttle 

stop ring (14) and secure them with the retaining 

rings (16). Install that assembly to the cover (20) and 

start the seal nuts (44) onto the screws (15).

Note:  The setting of the screws (15) isn’t important 

now — you will adjust them to the proper position 

later in the assembly procedure.

10.  Assemble the O-rings (8, 19) to the cover (20).
11.  Install the cover (20) into the cylinder (6), aligning 

the handle with the C-head. Secure with 12 cap 

screws (27). Torque to 32.5 newton-meters 

(24 foot-pounds).

12.  Position the trigger (32) onto the handle (26), align-

ing the holes. Install the trigger pivot (33) and secure 

it with 5/32" external retaining rings (34). Position 

the trigger strap (30) onto the handle and secure it 

with four screws (31).

Final Settings

1.  If the shuttle stop ring (14) was removed, refer to 

“Tool Setup” to adjust it to its previous position (for 

either open-center or closed-center operation).

2.  Set the relief valve to the proper pressure. Refer to 

“Relief Valve Check and Adjustment Procedure.”

Summary of Contents for LPK1240K

Page 1: ...ng Tool 12 ton Serial Code FYE 99932270 REV 4 2019 Greenlee Tools Inc 10 19 Read and understand all of the instructions and safety information in this manual before operating or servicing this tool Re...

Page 2: ...YE Keep this manual available to all personnel Replacement manuals are available upon request at no charge at www greenlee com Other Publications Instruction Manual Publication 99932245 SAE Standard J...

Page 3: ...vicing this tool Refer also to the Instruction Manual which is listed under Other Publications Failure to observe this warning could result in severe injury or death Skin injection hazard Do not use h...

Page 4: ...power source Accidental start up can result in serious injury Failure to observe this warning can result in severe injury or death Hydraulic oil can cause skin irritation Handle the tool and hoses wit...

Page 5: ...was not disturbed during Step 3 Tool Setup This tool can be used on either open center or closed center hydraulic systems Open Center Setting 1 With the ram retracted disconnect the crimping tool fro...

Page 6: ...e trigger side remove the spool OD O ring 38 from the handle 8 Remove cap 50 copper washer 49 adjusting screw 48 spring 47 and valve pin 46 from the handle 9 Remove retaining ring 64 ball stop 63 and...

Page 7: ...Install the ball 62 ball stop 63 and retaining ring 64 2 Install two 1 8 pipe plugs 45 into the handle 26 3 Install the O ring 24 onto the tube assembly 22 Slide the tube assembly into the handle 26...

Page 8: ...r Rockford IL 61109 2988 USA 815 397 7070 8 Illustration 2 4 9 54 6 11 12 61 13 51 27 40 39 37 38 22 45 10 5 17 8 18 7 25 24 25 30 32 34 31 33 28 26 41 42 43 35 36 40 47 46 50 48 49 56 67 55 20 14 29...

Page 9: ...5 O ring 437 x 562 x 062 68 1 36 43401 50434012 Washer 75 x 50 x 03 1 37 42865 50428651 Spring valve plunger 1 38 O ring 562 x 750 x 093 68 1 39 41095 50410952 Cap 1 40 Retaining ring 750 2 41 5206324...

Page 10: ...d IL 61109 2988 USA 815 397 7070 2019 Greenlee Tools Inc An ISO 9001 Company USA Tel 800 435 0786 Fax 800 451 2632 Canada Tel 800 435 0786 Fax 800 524 2853 International Tel 1 815 397 7070 Fax 1 815 3...

Reviews: