Dome Parts GmbH
Keltenstr. 2
86517 Wehringen,
Germany
phone: +49 8234 90 59 100
web: https://www.astrogfk.com/
e-mail: mail@astrogfk.com
... the observatory people
How to mount the corner support
beams in your
GreenLine MINI:
Assemble the rear inner corner support beams
(labeled B / C, C / D) as follows: at the bottom
with a screw (8 x 80) in the downward facing stub.
Then fix it by a screw (8x180) from above through
the guide bar. The corner beam should fit "snug" in
the corner, if necessary use a clamp, to help it in.
The last action is to drive a screw (8x80) from the
outside through plank (B and D) #11. (you may
need add more)
A screw (8x80) is driven-in from the outside of the
starter plank on the two front corner bars (door
area) that are also on the inside. Then again from
above, through the guide bar (8x180). Here, too, a
screw is driven-in from the outside in plank #11.
The left bar is also the door post. This receives
three screws (5x60), ascending from bottom to
top, in the pre-drilled holes. Here, too, using one
or more clamps are very helpful.
12
Corner support beams
How to install the corner support
beams in your
GreenLine Medium
and
GreenLine BIG:
Mount the corner support beams on the inside
(labeled A / B, B / C, C / D, D / E) as follows: at
the bottom with two screws (8 x 80) in the
downward facing stub. Then fix it by a screw
(12x200) from above through the guide beams.
The corner beam should fit "snug" in the corner, if
necessary use a clamp, to help it in.
The last action is to drive a screw (8x80) from the
outside through the planks (B and D) #11.
The first plank right next to the entrance on the
left is the door post, which is fastened at the
bottom with two screws (8x80). Then three times
(8x100), ascending from bottom to top, in the pre-
drilled holes.