Dome Parts GmbH
Keltenstr. 2
86517 Wehringen,
Germany
phone: +49 8234 90 59 100
web: https://www.astrogfk.com/
e-mail: mail@astrogfk.com
... the observatory people
Installation of the rails
That was all quite easy, wasn't it?
If everything went well,
all the walls, the guide
beams, as well as the support columns are now in
place.
Your kit contains several rail elements. They are
marked either "
roof
" or "
shutter
".
Please attach the rails to the
guide beams, using the existing
holes (long rail at the back, short
rail at the front).
In spite of everything, make sure
that all rail segments follow a
straight line.
Take care not to cause any
dents or cuts in the rails. This
largely determines how well
your roof will later run over
both rails!
Guide Rails
13