Greenline 33
47
The holding tank can be emptied by draining overboard at sea or by using a dockside pump-out connected to
the deck pump-out waste fitting.
The capacity of the tank is 60 litres . The indicator will show when the tank is full.
The holding tanks may be flushed. If cleaning is required only use ecologically friendly materials.
System shall be empty during storage at freezing temperatures.
GAS SYSTEM
When changing the cylinder, refit the cap on the pressure reduction valve threaded section to avoid corrosion.
See the Figure XX.
RECOMENDATION!
Don't forget to shut off the gas safety valve and pressure reducing valve when the stove is
not in use.
WATER DISCHARGE
Waste water from the closets is discharged by sea chests, fitted with quarter turn valves (when the valve
handle is perpendicular with the pipe, the valve is closed, and open when along the pipe centreline).
Water from the floor and stuffing boxes flow sat the centre of the boat. There is two separated zones fore and
aft the engine compartment (A waterproof carter under the engine receive the possible oil leaks).
The zone is drained by means of an electric pump.
RECOMENDATION!
Check the valves and sea cocks for water tightness and operation regularly.
Shut the valves when the system is not in use.
Visually check whether the pumps discharge.
Check the clamps and hose pipe couplings and seals for condition.
Ensure regularly that the bilge and strum-boxes are perfectly clean.
If one pump should be running while all water supplies are shut,
switch the power off immediately.
Check the water system and eliminate the breakdown.
Summary of Contents for GREENLINE 33
Page 1: ...OWNER S MANUAL GREENLINE 33 Revision 04 19 03 2012...
Page 2: ...Greenline 33 II...
Page 6: ...Greenline 33 VI Figure 38 Position of hoisting cradle and straps 88...
Page 13: ...Greenline 33 6 Figure 1 Boat main dimensions...
Page 16: ...Greenline 33 9 Figure 2 Boat examination report...
Page 17: ...Greenline 33 10 Figure 3 Engine examination certificate VW SDI 75 5...
Page 18: ...Greenline 33 11 Figure 4 Engine examination certificate VW TDI 165 5...
Page 19: ...Greenline 33 12 Figure 5 Declaration of Conformity...
Page 20: ...Greenline 33 13...
Page 25: ...Greenline 33 18 MAN OVERBOARD PREVENTION AND RECOVERY Figure 8 Working deck area plan...
Page 34: ...Greenline 33 27 Figure 14 Bilge pump system plan...
Page 36: ...Greenline 33 29 4 HULL THROUGH HULL FITTINGS Figure 16 Thru hull fitting positions...
Page 48: ...Greenline 33 41 7 PLUMBING Sea water plumbing Figure 22 Sea water plumbing...
Page 49: ...Greenline 33 42 Freshwater plumbing Figure 23 Fresh water plumbing...
Page 50: ...Greenline 33 43 Grey water plumbing Figure 24 Grey water plumbing...
Page 58: ...Greenline 33 51 Picture 5 INVERTER switch Phoenix multi control on the dashboard...
Page 74: ...Greenline 33 67 Picture 13 Main 12V power box Picture 14 Service box fuses...
Page 76: ...Greenline 33 69 Picture 17 Shore power fuse Picture 18 LiPo battery bank main fuse...
Page 77: ...Greenline 33 70 Picture 19 Hybrid box fuses Picture 20 Hybrid control unit main fuse...
Page 99: ...Greenline 33 92 UN MOUNTING LIPO BATTERY BANK 8 STEPS Picture 1 Step 1 Picture 2 Steps 2 7...
Page 100: ...Greenline 33 93 Picture 3 Step 7 Picture 4 Step 8 Step 1...
Page 102: ...Greenline 33 95 12 APPENDIX A Wiring diagrams...
Page 108: ...Greenline 33 101 14 NOTES...
Page 109: ...Greenline 33 102...
Page 110: ...Greenline 33 103...