15
To complete the inclusion process perform the following steps:
1.
Plug the PowerNode into an electrical outlet.
2.
On the Gateway, press and release the sync button once. The activity indicator
begins to display a clockwise rotating pattern. When this rotating “inclusion mode”
pattern appears on the Gateway activity indicator, the Gateway is ready to be synced
with the PowerNode.
If you attempt to include a PowerNode from another energy management system with an “alien”
Gateway, the inclusion will fail and the indicator bars will flash rapidly.
3.
Locate the sync button on the PowerNode. It is a small round button on the side of the device,
marked with the sync symbol.
4.
Press and hold the sync button for approximately one second until the PowerNode
activity indicator begins to display a clockwise rotating pattern, indicating that the
PowerNode is attempting inclusion. During this process, verify that the Gateway
activity indicator still displays a clockwise rotating pattern. If not, then the Gateway is
not in inclusion mode and you must return to step 2.
5.
After a few seconds, the rotating pattern on both the PowerNode and the Gateway
should stop and all bars turn green (forming a circle) for several seconds to indicate
successful inclusion. The PowerNode is now part of your energy management
system, and you can connect a device (refer to the instructions that came with your
PowerNode to plug in your device).
Summary of Contents for PowerNode NP220-B
Page 1: ...PowerNodes NP220 B NP222 B NS220 B NS222 B...
Page 10: ...8...
Page 23: ...21 Document Version 1 03 Model Numbers NP220 B NP222 B NS220 B NS220 B...
Page 25: ......
Page 26: ...Back Cover...