16
If all bars on the activity indicator flash instead of forming a solid circle, then the PowerNode inclusion
process has failed, and you must start over.
Network Exclusion Process
Note: If your PowerNode is new and has never been used before, then you should not need to perform the
exclusion process.
A PowerNode that has been previously used with a different Z-Wave network must have its association (homeID)
with the other network removed before you can connect it to your GreenWave Reality energy management
system. This process is called “exclusion” and requires you to perform steps with both the Gateway and the
PowerNode.
To complete the exclusion process perform the following steps:
1.
Plug the PowerNode into an electrical outlet.
2.
On the Gateway, press and hold the sync button until the activity indicator begins to
display a counter-clockwise rotating pattern. When this rotating “exclusion mode”
pattern appears on the Gateway activity indicator, the Gateway is ready to perform
the exclusion of the PowerNode.
3.
Locate the sync button on the PowerNode. It is a small round button on the side of the device,
marked with the sync symbol.
Summary of Contents for PowerNode NP220-B
Page 1: ...PowerNodes NP220 B NP222 B NS220 B NS222 B...
Page 10: ...8...
Page 23: ...21 Document Version 1 03 Model Numbers NP220 B NP222 B NS220 B NS220 B...
Page 25: ......
Page 26: ...Back Cover...