10.2 INSTALL THE BLOWER TUBE
1. Align the grooves on the rear tube (7) with tabs (6) on the
blower housing.
2. Install the rear tube (7) onto the blower housing until the
tabs (6) engage the grooves.
3. Turn the rear tube in the direction of the arrow until the
two tabs lock into the positions.
6
7
4. Connect the front tube in the same procedure above.
10.3 INSTALL THE BATTERY PACK
WARNING
•
If the battery pack or charger is damaged, replace the
battery pack or the charger.
•
Stop the machine and wait until the motor stops before
you install or remove the battery pack.
•
Read and understand the instructions in the battery and
charger manual.
1. Align the lift ribs on the battery pack with the grooves in
the battery compartment.
2. Push the battery pack into the battery compartment until
the battery pack locks into place.
3. When you hear a click, the battery pack is installed.
10.4 REMOVE THE BATTERY PACK
1. Push and hold the battery release button.
2. Remove the battery pack from the machine.
11
OPERATION
WARNING
Make sure the blower tube is in position before operation.
11.1
START THE MACHINE
1
2
3
1. Pull the trigger (1) to start the machine.
2. Pull the trigger fully to increase the speed.
3. Release the trigger to decrease the speed.
11.2
STOP THE MACHINE
1. Release the trigger to stop the machine.
NOTE
Wait until the motor stops after you stop the machine.
11.3
CRUISE CONTROL LEVER
1
2
3
5
English
EN