Link-Belt MG-534 Calibration
20
W450160 10/07
Menu 04 – Swing Pot Zero
This routine is required only on models that have swing potentiometers.
The zero point for the swing potentiometer is straight (in-line) over the front of the carrier.
Swing direction is similar to a compass
whereas if the boom is straight (in-line)
over the front of the carrier it is at
zero degrees (0°). Rotating the boom
in a clockwise direction (to the right)
will cause the readout to increase.
Conversly, rotating the boom in a
counterclockwise direction (to the left)
will cause the readout to decrease. If
the swing potentiometer is connected in
such a way that it causes the readout to
be reversed, it can be corrected by using
the direction sub-menu.
Swing Pot Zero
From the previous menu, press the key adjacent to
Menu Up
to go to “04 Swing Pot”.
Press the key adjacent to
04 Swing Pot
.
Clockw
ise - I
ncre
ase
Re
adin
g
Co
un
ter
clo
ck
wis
e -
De
cre
ase
Re
adin
g
FRONT
LOAD
0.8
ANGLE
41.8
RADIUS
76.2 FT
LENGTH
106.0
04 Swing Pot
Menu Up
Menu Down
Exit
Summary of Contents for MG-534
Page 1: ...Link Belt MG 534 Rated Capacity Indicator System Calibration...
Page 2: ......
Page 4: ...Link Belt MG 534 Calibration ii W450160 10 07...
Page 53: ...Link Belt MG 534 Calibration A 4 W450160 10 07...
Page 54: ......
Page 55: ......