GREER COMPANY
Crane Systems
GREER COMPANY, 1918 E. Glenwood Place, Santa Ana CA 92705 Telephone: (714) 259-9702. Fax: (714) 259-7626. PN W424102 REV C 09/99
MicroGuard
®
424 Installation Manual
9 of 35
PROCEDURE FOR CONNECTING CABLE
SHIELDS
NOTE CHAMFER ON INNER EDGE OF COLLET
MUST BE ALIGNED TO MATE WITH CONE ON
1. PASS SECTIONS A. THROUGH E. OVER THE CABLE IN THE ORDER SHOWN.
2. STRIP BACK THE OUTER COVER OF THE CABLE EXPOSING THE SHIELD
.
3. TRIM BACK THE BRAID TO APPROX. 0.25" AND DRAW OUT TO A CONE SHAPE
TO CONFORM TO THE GLAND CONE. PASS THE CABLE CONDUCTORS THROUGH THE
BULKHEAD LOCATING THE SHIELD OVER THE CONE. SLIDE THE COLLET (ITEM A)
OVER THE SHIELD AND LOCK IT IN POSITION BY SCREWING DOWN THE CLAMP
(ITEM B) UNTIL TIGHT. FINALLY POSITION THE MOISTURE SEAL AND FIBER
WASHER (ITEMS C & D) AND TIGHTEN DOWN THE STRAIN RELIEF (ITEM E).
A
D. FIBER WASHER
E. STRAIN RELIEF
A. SHIELD COLLET
B. SHIELD CLAMP
C. MOISTURE SEAL
BULKHEAD FITTING.
{
B
C
D
E