05.2012
58
5.
1.
b
2.
3.
4.
III
IV
II
I
a
a
Tetra
Subject to technical modifications
Parking and uncoupling
11.2 Pull out the set-down supports
and lower the implement
NOTE
Before pulling out the set-down sup-
ports the folded out implement must
be folded in - see Chapter “Fold in
the implement“ - Page 54.
Fig. 81; Top set-down support
NOTE
The Tetra 7500 L and 9000 L are
also equipped with set-down sup-
ports (III + IV) at the rear.
These must also be pulled out as
described above before setting
down the implement.
Fig. 82; Put out the support
Fig. 83; Rear support, Tetra 7500 L and 9000
L
►
1.) Pull out spring cotter.
►
2.) Pull out pins.
►
3.) Pull out the support as far as the
lower edge of the spike disc harrow
/ crosskill roller (fig. 85, a).
►
4.) Fasten the support by inserting the
pin below the receptacle (b).
►
5.) Secure the pin with a spring cotter.
►
Lift the implement with the three-point
power lift until the supports (I + II) can
be freely pulled out.
►
Lower the implement onto the supports
with the three-point power lift.
Summary of Contents for Tetra 3001 L
Page 4: ...05 2012 4 Tetra Subject to technical modifications ...
Page 104: ......
Page 106: ......
Page 107: ...107 05 2012 Tetra Subject to technical modifications 21 0 EU Declaration of Conformity ...
Page 108: ......
Page 110: ......
Page 111: ......