background image

E39.0.31.6C-03 

Operating instruction T-Logg 160 

page 6 of 8

 

 

7.  Insert the new button cell (type CR 2032) with correct 

polarity in the socket (the positive pole is on the retaining 
bracket). 

 

8.  Induct the sensor connection into the hole of the probe 

tube and put the board into the housing.  

   

 

9.  Thread the foam rubber onto the connector again and 

move it back into the probe tube.  

   

 

10.   Plug the sensor element to the connector  (mind right 

mounting position). 

  Note: 

The connection pins can break if they are 
inappropriately handled! 

   

 

11.  Screw the protective head on the sensor tube.  

 

12.  Reassemble the cover to the housing.  

 

Finished 

 

 

 
 
 
 
 

 

Environmental Reference! 

Empty and defective batteries must not be disposed in the  

                regular domestic waste. 
                Return the used batteries to an authorised battery 
                collecting point or send the batteries directly to us 
                (sufficiently stamped). 

 

 

 
 

Summary of Contents for T-Logg 160

Page 1: ...E39 0 31 6C 03 GREISINGER electronic GmbH Data logger for humidity temperature as of version V1 0 Operating Manual T Logg 160...

Page 2: ...Trouble free operation and reliability of the device can only be guaranteed if the device is not subjected to any other climatic conditions than those stated under Specification To protect the battery...

Page 3: ...layed as well STOP The T Logg is stopped No data are recorded The logger memory is empty The logger is reset and can be restarted HALT The T Logg has been halted The stored data can be read The logger...

Page 4: ...the logger ERROR 2 The measured value has been fallen below the measuring range of the logger ERROR 7 The T Logg has detected a system fault Remedy Remove battery and wait about 30 minutes Then inser...

Page 5: ...nt to replace the battery on yourself it is also possible to send the device to us We will replace the battery cost effectively and appropriately Replacement 1 Remove the 4 screws at the front of the...

Page 6: ...ector again and move it back into the probe tube 10 Plug the sensor element to the connector mind right mounting position Note The connection pins can break if they are inappropriately handled 11 Scre...

Page 7: ...changeable Battery service life approx 3 years if interval is 15 min depending on measuring cycle and operating temperature Interface Serial interface 3 pin miniature plug Data communication via inter...

Page 8: ...E39 0 31 6C 03 Operating instruction T Logg 160 page 8 of 8...

Reviews: