Beijing Grinder Instrument Co., Ltd. Tel
:
010-82363430
Fax
:
010-82363435
26
Z
5.14 Start instrument
First Step
:
installing all accessories well.
Second step:
close and lock the grinding chamber door.
Third step:
setting the grinding speed.
Forth step
:
press “
START
” key to start the instrument.
5.15 Stop the instrument
Press”
STOP ” key to stop the instrument.
5.16 Using the cyclone
CM100M can connect with cyclone when need to collect some light samples,eg:plastic
bag,paper bag and packing material for milk products.
5.17 Install the cyclone
5.17.1 Function introduction of parts
:
fig 5.17.1
1.cover of cyclone
2.feeding hopper of cyclone
3.Cover of collecting bucket
4.Lock
5.5L collecting bucket
6.Supplied handle of cyclone
7.supplied bar
8.outlet hopper of cyclone
(
incl 4 pcs of hexagon socket head screws M4x8
)
9.fixed sets of cyclone
(
incl 4 pcs of hexagon socket head screws M6x12
,
1 pc of hexagon
socket head screws M6x20
)