Beijing Grinder Instrument Co., Ltd. Tel
:
010-82363430
Fax
:
010-82363435
18
B
M1-1
M1-2
can open the grinding room.
Lock the grinding room door with opposite order.
(
fig 5.3.1
)
(
fig 5.3.2
)
Note
:
The grinding chamber door can be closed only when the grinding chamber grinding
surface without any samples to ensure instrument ,components and seal rings.
Please don’t open the door when the motor is running,it’s danger to personal safety.
lease take safety measure before grinding poisonous and unhealthy substances.
5.4 Install/replace the cutting type accessories
(
fig 5.4.1~5.4.4
)
First step
:
Installing the grinding set M1-2:please align the slot I(3 places totally) with
limited post G(3 places totally
)
,and the outlet J match to the bottom outlet and turn the
M1-2 to the innermost,the 2 limited holes L should match to limited post H when install the
M1-2 with position.Refer to fig
5.4.1~5.4.3
Second step
:
insert the rotor M1-3:insert the rotor into the drive shaft K and turn the rotor
to the innermost position,refer to fig
5.4.4
Third step
:
Install the bottom sieve M1-4:place the bottom sieve to the bottom of M1-2
and lock the sieve between two cutting bars N and put it into innermost place.Refer to fig
5.4.4
Note
:
Replace the accessories with opposite order.