Model 7300 Power Pinner CD Hand Welder
8
SET-UP AND WELDING
CONNECTING THE GROUND CLAMP
Attach the clamp of the welding ground lead to the work piece. Prior to securing the clamp,
make certain that the contact area is free of rust, paint, grease, or any other impurities to ensure
a good ground connection.
READY FOR WELDING
When you have completed all of the previous steps to prepare for welding, attach the ground
cable to the work area, setting up, you can now power on the welder. The controller ON/Off
switch is located on the side of the unit in the upper right hand corner. Next to this switch is the
15 amp circuit breaker for the system.