-30-
Model G0453Z/G0454Z (Mfg. 1/09+)
Table Height Chain & Sprockets
The table leadscrews are synchronized by the
table height chain and sprockets located under-
neath the base of the planer. Remove the front
and rear cabinet panels to access these parts
(see
Figure 27). Use shop rags to clean away
debris and grime, then brush on a light coat of
SAE 30W oil to the chain and sprockets.
Figure 27. Table height chain and sprockets as
viewed from underneath the base.
Drive Chain & Sprockets
The infeed and outfeed rollers receive transferred
power from the cutterhead through the drive chain
system on the right side of the machine, as shown
in
Figure 28.
Remove the table height handwheel and the
safety covers attached to the inside of the drive
chain cover, then remove the cover to access
these parts.
Use shop rags to clean away any debris and
grime, then brush on a light coat of SAE 30W oil
to the chain and sprockets.
Figure 28. Drive chain and sprockets.
Gearbox Oil
The gearbox oil should be changed after the first
20 hours of operation to clear away any debris
inside the gearbox, then changed annually there-
after.
Although it is not necessary to remove the drive
chain cover to access the fill and drain plugs, it is
more convenient to do so (see
Figures 29–30).
Replace the gearbox oil with 80W–90W gear oil
until it just reaches the fill plug.
Figure 29. Gearbox drain plug.
Drain Plug
Figure 30. Gearbox fill plug.
Fill Plug
Summary of Contents for G0453Z
Page 68: ......