-14-
Model G0765 (Mfd. Since 5/15)
SECTION 3: SETUP
The list below outlines the basic process of pre-
paring your machine for operation. Specific steps
are covered later in this section.
The typical preparation process is as follows:
1. Unpack lathe and inventory contents of box/
crate.
2. Clean lathe and its components.
3. Identify an acceptable location for lathe and
move it to that location.
4. Assemble loose components and make any
necessary adjustments or inspections to
ensure lathe is ready for operation.
5. Connect lathe to power source.
6. Test run lathe to ensure it functions properly.
7. Perform spindle break-in procedure to pre-
pare lathe for operation.
Preparation
SUFFOCATION HAZARD!
Keep children and pets away
from plastic bags or packing
materials shipped with this
machine. Discard immediately.
The following are needed to complete the setup
process, but are not included with your machine.
Description Qty
•
Additional People ....................................... 1
•
Safety Glasses ............... 1 For Each Person
•
Cleaner/Degreaser (
Page 18) .... As Needed
•
Quality Metal Protectant ............. As Needed
•
Disposable Shop Rags ............... As Needed
Needed for Setup
This machine was carefully packaged for safe
transport. When unpacking, separate all enclosed
items from packaging materials and inspect them
for shipping damage.
If items are damaged,
please call us immediately at (570) 546-9663.
IMPORTANT: Save all packaging materials until
you are completely satisfied with the machine and
have resolved any issues between Grizzly or the
shipping agent. You MUST have the original pack-
aging to file a freight claim. It is also extremely
helpful if you need to return your machine later.
Unpacking
Summary of Contents for G0765
Page 76: ......