Model G0812 (Mfd. Since 2/16)
-17-
5. Install each of (4) M16-2 x 75 leveling hex
bolts with (1) M16-2 hex nut into each of the
(4) mounting holes in frame, as shown in
Figure 11.
— If you choose not to install included level-
ing bolts, refer to
Anchoring to Floor for
additional options.
Lifting & Placing
HEAVY LIFT!
Straining or crushing injury
may occur from improperly
lifting machine or some of
its parts. To reduce this risk,
get help from other people
and use a forklift (or other
lifting equipment) rated for
weight of this machine.
6. Carefully lower machine onto floor, and then
back forklift away.
7. Adjust each leveling hex bolt as needed to
stabilize machine.
8. Tighten hex nuts against frame to secure
leveling bolts.
Figure 11. Leveling bolt threaded into frame.
4. With an assistant helping to stabilize the load,
lift machine just high enough to clear pallet
and any floor obstacles, then place machine
in final position on shop floor.
Figure 10. Inserting forklift forks for lifting
machine.
To lift and place machine:
1. Position crate as close as possible to instal-
lation location, then remove top and sides of
crate.
2. Remove small items packed around machine
and unbolt machine from pallet.
3. Remove shipping material underneath cen-
ter opening, then place forklift forks through
opening (see
Figure 10) so forks are as wide
as possible for stability.
Leveling Hex
Bolt
(1 of 4)
Hex Nut
(1 of 4)