-18-
Model G0901 (Mfd. Since 09/19)
13. Tighten all track bracket carriage bolts and
lock nuts.
14. Check that track is level front-to-back and
side-to-side and adjust feet if needed.
15. Attach guide rail to each side of track with
(6) M10-1.25 x 20
carriage bolts, 10mm flat
washers, and M10-1.5 lock nuts (see
Figure
16).
Figure 16. Attaching guide rail.
Guide Rail
Figure 17. Guide rail installed.
Guide Rail
16. Use forklift or hoist to lift carriage and place it
on track.
Note: Carriage must face forward for log sup-
ports and log clamp to function.
Log clamp is
attached to front rail section.
17. Attach caster bracket with brake to right-rear
corner of carriage with (2) M8-1.25 x 20 hex
bolts, 8mm lock washers, and 8mm flat wash-
ers (see
Figure 18).
18. Attach each remaining caster bracket to
remaining corners of carriage with (2) M8-1.25
x 20 hex bolts, 8mm lock washers, and 8mm
flat washers (see
Figure 18).
Figure 18. Caster brackets installed on carriage.
Caster Bracket
with Brake
Caster
Bracket
x 8
Summary of Contents for G0901
Page 56: ......