Model T32339 (Mfd. Since 03/21)
-17-
Test Run
Once assembly is complete, test run the machine
to ensure it is properly connected to power and
safety components are functioning correctly.
If you find an unusual problem during the test run,
immediately stop the machine, disconnect it from
power, and fix the problem BEFORE operating the
machine again. The
Troubleshooting table in the
SERVICE section of this manual can help.
DO NOT start machine until all preceding
setup instructions have been performed.
Operating an improperly set up machine
may result in malfunction or unexpect-
ed results that can lead to serious injury,
death, or machine/property damage.
Serious injury or death can result from
using this machine BEFORE understanding
its controls and related safety information.
DO NOT operate, or allow others to operate,
machine until the information is understood.
Eye injury hazard! Always
wear safety glasses when
handling pressurized air
system.
The Test Run consists of verifying the following:
1) The compressor oil level is sufficient, 2) the
motor powers up and runs correctly, 3) the motor
and pump turn
OFF when the cut-out pressure
is reached, and 4) the safety relief valve works
correctly.
Figure 16. Location of pressure switch lever.
5. Turn drain valve handle all the way counter-
clockwise to open (see
Figure 17).
Figure 17. Drain valve handle in open position.
6. Connect machine to power supply.
7. Move pressure switch lever to AUTO posi-
tion to turn machine
ON and verify motor
operation.
Motor should run smoothly and without
unusual problems or noises.
Pressure
Switch
Lever
Drain Valve
Handle
To test run machine:
1. Check oil level (refer to Lubrication on Page
25 for instructions).
2. Clear all setup tools away from machine.
3. Locate machine in well-ventilated area at
least 18 inches from nearest wall or any
obstructions.
4. Move pressure switch lever to OFF position
(see
Figure 16).
Summary of Contents for T32339
Page 48: ......