6 OM-DH/INA/2-100
Inspection & Unpacking
WARNING
THIS UNIT MUST BE INSTALLED BY
PERSONNEL WHO ARE QUALIFIED TO
WORK WITH ELECTRICITY AND PLUMBING.
IMPROPER INSTALLATION CAN CAUSE
INJURY TO PERSONNEL AND/OR DAMAGE
TO THE EQUIPMENT. THE UNIT MUST
BE INSTALLED IN ACCORDANCE WITH
APPLICABLE CODES.
The unit is delivered completely assembled, on a heavy skid surrounded by a wooden
crate. Immediately upon receipt, inspect the unit for damage. Report any shipping damage
or an incorrect shipment to the delivery agent.
Write down the model number, serial number, and installation date of your unit, and keep
this information for future reference. Space for these entries is provided at the top of the
Service Log provided at the rear of this manual. The unit is anchored to two metal shipping
channels (braces) which may be discarded after installation. Carefully unbolt one side of
shipping channel. Position the kettle and remove second shipping channel.
The unit is delivered crated and
bolted to a heavy skid.
Two heavy shipping channels
(braces) anchor the unit for
shipment.
Shipping Channels (Braces)
When installation is to begin, unbolt the unit from the skid, and lift the unit straight up and
off the skid.
UTILITY REQUIREMENTS
1. Electrical Supply Connection-3 Phase Operation Only
a. The panel must be removed to gain access to the electrical supply connection.
Open the wiring and control panel by unscrewing the eight screws which hold it in
place. Grasp the panel by the base at the bottom edge. While lifting the panel, swing
its bottom toward you. Set the panel aside.
b. Supply Voltage: The unit must operate at the rated nameplate voltage, plus or minus
10 percent.
c. Wiring Information: Refer to the electrical schematic for wiring information. A copy
of the schematic is found inside the control panel and at the rear of this manual.
d. Terminal Block: The terminal block for incoming power is located at the back of the
control compartment. The ground terminal is located next to the terminal block. The
unit must have a separate ground wire for safe operation.
e. High Voltage safety
WARNING
SHIPPING CHANNELS (BRACES) ARE VERY
HEAVY. USE PROPER LIFTING AND HANDLING
EQUIPMENT FOR MOVEMENT.
CAUTION
WATCH OUT FOR NAILS AND SPLINTERS
WHILE DISMANTLING THE SHIPPING CRATE.
CAUTION
UNIT HASAN APPROXIMATE SHIPPING
WEIGHT OF 1600 LBS. (727 KG.). FOR SAFE
HANDLING, INSTALLER SHOULD OBTAIN
PROFESSIONAL RIGGING HELP AS NEEDED
AND USE MATERIAL HANDLING EQUIPMENT
(SUCH AS A FORKLIFT, OVERHEAD HOIST, OR
PALLET JACKS) TO REMOVE THE UNIT FROM
THE SKID AND MOVE IT TO ITS PLACE OF
INSTALLATION.
WARNING
TO AVOID DAMAGE OR INJURY, FOLLOW THE
ELECTRICAL SCHEMATIC EXACTLY WHEN
CONNECTING THE UNIT.