background image

1

English

Installation

   1. Remove the two screws (A1) from the fitting template (A), 

then remove the template, see fold-out page I, fig. [1].

   2. Turn the valve stem (C) clockwise to the 

OFF 

position.

   3. Make sure the water supply is turned on at the service 

stop valves (B). Stop valves must be in fully open position 
(slots horizontal) for valve to function.

   4. The adjustable hot water limit stop (D) is factory set at 

neutral position to give maximum outlet temperature, see 
fig. [2] and [6].

Please refer to chapter 

"Maximum hot water limit setting"

 

for limiting maximum outlet temperature.

   5. Install adapter (E) onto the valve stem (C), by placing the 

lever stop pin (E1) on top of the "Arrow" 

 (F) and tighten 

with screw (G).

   6. Push cap (H) with drain hole facing down onto the plastic 

guide (I) by gently pressing the slotted section (I1) on the 
plastic guide.

   7. Slide the escutcheon (J) over the cap (H) and tighten with 

screws (J1), see fig. [3]. 
Do not use excessive force to tighten the screws.

   8. Fit insulator (K) onto cartridge actuating lever and fit 

screw (L), see fig. [4].

   9. Fit lever (M), secure by tightening the loosely fitted set 

screw with 3mm allen wrench and insert plug (M1).

 
The pressure balancing valve is now ready for use.

Caution!
Do not lift the lever on the handle to operate this valve. 
This pressure balancing valve opens from cold to hot by 
turning the lever counterclockwise,

 see fig. [5]. 

If the pressure balancing valve is installed too deep, 

the 

fitting depth can be increased by 1" with an extension set, 
Part No. 47 344, see fold-out page II.

Maximum hot water limit setting

The adjustable hot water limit stop (D) is factory set in a 
neutral position (0), see fig. [6].

On applications requiring to limit the valve opening from full hot 
position, the factory set adjustable hot water limit stop must be 
reset as described below.

1. Remove the factory set adjustable hot water limit stop (D), 

see fold-out page III, fig. [7].

2. Slide the adapter (E) onto the valve stem (C), by placing 

the lever stop pin (E1) on top of "Arrow" 

 (F), see fig. [6] 

and [8].

3. Turn the adapter (E) counterclockwise until the outlet water 

reaches the desired temperature and read the corres-
ponding number (1 to 10, see fig. [6]) against the lever stop 
pin (E1).

4. Close the valve by turning the adapter (E) clockwise and 

remove the adapter (E), see fig. [8].

5. Align the white mark (D1) on the limit stop against the 

number (1 to 10, see fig. [6]) you have selected on the dial 
and slide the limit stop (D), see fig. [9].

6. Proceed to item 5 in chapter 

Installation

.

Note:

The preset maximum temperature will change if the inlet 
temperatures change or the setting of the water heater 
thermostat is altered.

Winterizing the system

It is recommended that the 

"pressure balancing cartridge"

 

be removed from the valve casting if the system is to be shut 
off during the winter.

Maintenance

Check, clean and if necessary, replace parts.

Grease with special valve grease.

Pressure balancing cartridge

1. Lever out plug (M1) and loosen set screw with an 3mm 

allen wrench, see fig. [10].

2. Pull off lever (M).
3. Detach screws (J1) and remove escutcheon (J).
4. Shut off hot and cold water stops (B). The slots are vertical 

when the stops are in the off position, see fig. [11].

5. Pull off cap (H), loosen screws (I2) and detach plastic 

guide (I), see fig. [12]. 

6. Close the valve by turning the stem clockwise. Detach stop 

ring (N) and 

note position

.

7. Loosen the four corner screws (O1) and remove valve 

cover (O).

8. Pull the pressure balancing cartridge (P) out of the valve 

body noting the location of 

"H"

 and 

"C"

 marking near the 

cartridge inlets.

9. Remove the check valve inserts (Q).

If the check valves are removed it is important to reinstall 
them with the O-ring facing away from the cartridge. If they 
are installed incorrectly no water will flow.

The pressure balancing cartridge (P) must be replaced as a 
complete unit.

Reassemble in reverse order. Ensure that the hot 

"H"

 and 

cold 

"C"

 markings are on the correct side. 

Be sure that the stop ring (N) is installed in the position noted 
in item 6.

Replacement parts

, see fold-out page II (* = special 

accessories)

Care

Instructions for care of this faucet will be found in the Limited 
Warranty supplement.

Summary of Contents for Concetto 19 457

Page 1: ...English 1 Français 2 Español 3 Concetto Concetto 96 445 031 ÄM 211335 09 07 19 457 ...

Page 2: ...E G H D I I1 E1 4 M M1 K L 3 m m S v p remettre cette instruction à l utilisateur de la robinetterie Entregue estas instrucciones al usario final de la grifería Please pass these instructions on to the end user of the fitting D F 0 6 ...

Page 3: ...II ...

Page 4: ...ver stop pin E1 on top of Arrow F see fig 6 and 8 3 Turn the adapter E counterclockwise until the outlet water reaches the desired temperature and read the corres ponding number 1 to 10 see fig 6 against the lever stop pin E1 4 Close the valve by turning the adapter E clockwise and remove the adapter E see fig 8 5 Align the white mark D1 on the limit stop against the number 1 to 10 see fig 6 you h...

Page 5: ...he F voir fig 6 et fig 8 3 Tourner le raccord de manette E dans le sens inverse des aiguilles d une montre jusqu à ce que l eau s écoulant atteigne la température souhaitée et noter le numéro cor respondant 1 à 10 voir fig 6 à la butée de manette E1 4 Fermer le robinet en tournant le raccord de manette E dans le sens des aiguilles d une montre puis enlever le raccord de manette E voir fig 8 5 Alig...

Page 6: ... palanca E en sentido contrario al de los punteros del reloj hasta que el agua de salida alcance la temperatura deseada y lea el número correspondiente 1 a 10 ver fig 6 respecto de la patilla de tope del adaptador E1 4 Cierre la válvula girando para ello el adaptador de palanca E en el sentido de los punteros del reloj y remueva el adaptador de palanca ver fig 8 5 Alínie la marca blanca D1 del top...

Page 7: ...III C E1 E 8 D1 9 D 7 B B 11 Q P C O O1 N I I2 H 12 J J1 M 3 m m 10 M1 ...

Page 8: ...ississauga Ontario Canada L5E 1E9 Technical Services Services Techniques Phone Tél 905 271 2929 Fax Télécopieur 905 271 9494 Grohe America Inc 241 Covington Drive Bloomingdale IL 60108 U S A Technical Services Phone 630 582 7711 Fax 630 582 7722 ...

Reviews: