Off-Grid (II)

PV energy supply priority setting:

PV power will charge battery first. After battery is fully charged, if there is remaining 
PV  power  left,  it  will  provide  power  to  the  load.  Feed-in  to  the  grid  is  not  allowed 
under this mode. At the same time, the grid relay is connected in Inverter mode. That 
means the transfer time from inverter mode to battery mode will be less than 15ms. 
Besides,  it  will  avoid  overload  fault  because  grid  can  supply  load  when  connected 
load is over 5KW.

Battery charging source: 

1.

PV  or  Grid:  If  there  is  remaining  PV  power  after  supporting  the  loads,  it  will 

charge battery first. Only until PV power is not available, grid will charge battery.  

2.

PV only: It is only allow PV power to charge battery. 

3.

None: It is not allowed to charge battery no matter it’s PV power or grid.

NOTE: It’s allowed to set up AC charging duration. 

Load supply source: 

When PV power is available: 1st PV, 2nd Grid, 3rd Battery

PV power will provide power to the load first. If it’s not sufficient, grid will provide 
power to the load. If grid is not available at the same time, battery power will back 
up.

 1st Battery, 2nd Load 

When PV power is not available:

1.

1st Grid, 2nd Battery: Grid will provide power to the load at first. If grid is not 

available, battery power will provide power backup.

2.

1st  Battery,  2nd  Grid:  Battery  power  will  provide  power  to  the  load  at  first.  If 

battery power is running out, grid will back up the load.

NOTE: This option will become ineffective during AC charging time and the priority 
will  automatically  become  1st  Grid  and  2nd  Battery  order.  Otherwise,  it  will  cause 
battery damage. 

·

Off-Grid (III)

PV energy supply priority setting: 

PV power will provide power to load first and then charge battery. Feed-in to the grid 
is  not  allowed  under  this  mode.  The  grid  relay  is  NOT  connected  in  Inverter  mode. 
That  means  the  transfer  time  from  inverter  mode  to  battery  mode  will  be  about 
15ms. If connected load is over 5KW and grid is available, this inverter will allow grid 
to  provide  power  to  the  loads  and  PV  power  to  charge  battery.  Otherwise,  this 
inverter will activate fault protection.

Battery charging source: 

1.

PV  or  Grid:  If  there  is  remaining  PV  power  after  supporting  the  loads,  it  will 

charge battery first. Only until PV power is not available, grid will charge battery.  

2.

PV only: It is only allow PV power to charge battery. 

1st Load, 2nd Battery 

41

42

Summary of Contents for 5000HYP

Page 1: ...GROWATT NEW ENERGY TECHNOLOGY Co LTD Growatt 5000HYP Installation Operation Manual...

Page 2: ...Module DC Connection 6 Battery Connection 7 Load AC Output Connection 8 9 EMS Connection Communication 10 Dry Contact Signal 11 Relay Control Port 12 Application with Energy Meter 13 Commissioning 14...

Page 3: ...modules to the inverter Do not connect the positive or negative terminal of the solar panel to the ground See Figure 1 for a simple diagram of a typical solar system with this hybrid inverter Note By...

Page 4: ...r injury to persons Use only recommended accessories from installer CAUTION cooling fan To reduce risk of fire hazard do not cover or obstruct the CAUTION been dropped or otherwise damaged in any way...

Page 5: ...lease inspect the unit Be sure that nothing inside the package is damaged You should have received the following items inside of package Inverter unit PV connectors Mounting plate Fixing screws Softwa...

Page 6: ...s dry free of excessive dust and has adequate air flow Do NOT operate it where the temperature and humidity is beyond the specific limits Please check the specs for the limitations Installation positi...

Page 7: ...The reference tightening torque is 35 N m 3 Fix the inverter in position by screwing the supplied two screws M4 12 located on the top two sides of the inverter 2 Raise the inverter and place it over...

Page 8: ...AC wire Nominal Grid Voltage Model Conductor cross section mm2 AWG no 230VAC Growatt 5000HYP 6 10 5 2 Connecting to the AC Utility Overview of AC Connection Socket Step 1 Check the grid voltage and fr...

Page 9: ...les Step 1 Check the input voltage of PV array modules The acceptable input voltage of the inverter is 250VDC 900VDC This system is only applied with two strings of PV array Please make sure that the...

Page 10: ...nal and crimp male terminal as shown below charts Insert assembled cable into male connector housing as shown below charts Then use spanner to screw pressure dome tightly to female connector and male...

Page 11: ...y vented and Gel battery Please check maximum charging voltage and current when first using this inverter If using Lithium iron or Nicd battery please consult with installer for the details NOTE2 Plea...

Page 12: ...and efficient operation to use appropriate cable for AC connection To reduce risk of injury please use the proper recommended cable size as below To prevent further supply to the load via the inverte...

Page 13: ...onnector Otherwise it will damage this inverter It s only allowed to connect load to AC Output Connector Do NOT Please set up mains output in parameter setting of bundled software When Emergency power...

Page 14: ...r power will only charge battery and overload protection will be automatically enabled 24 Communication 10 The inverter is equipped with several communication ports and it is also equipped with a slot...

Page 15: ...ion Description Unit Status Condition Dry contact port NO C NC C Power Off Power On Unit is off and no output is powered Battery voltage is lower than setting battery cut off discharging voltage when...

Page 16: ...ct Pin 1 and Pin 4 shown as below charts 12 2 Function Description Unit status Condition Output voltage from relay control port Power Off Power On Unit is off and no output is powered When the unit is...

Page 17: ...d batter circuit breaker and DC circuit breaker are installed correctly Step 2 Switch on the battery circuit breaker and then switch on PV DC breaker After that if there is utility connection please s...

Page 18: ...ckup IV option is selected in PV energy supply priority the inverter is only operated between two working logics based on defined peak time and off peak time of electricity Only peak time and off peak...

Page 19: ...rid tie with backup II or Grid tie with backup III modes Allow battery to feed in to the Grid when PV is unavailable This option is only valid in all options of Grid tie with backup mode Grid tie with...

Page 20: ...3rd Grid When PV power is not available 1 1st Grid 2nd Battery Grid will provide power to the load at first If grid is not available battery power will provide power backup 2 1st Battery 2nd Grid Bat...

Page 21: ...is sufficient it will charge battery next If there is remaining PV power left it will feed in to the grid Feed in to the grid is default disabled Battery charging source PV only Only after PV power fu...

Page 22: ...t allowed to charge battery no matter it s PV power or grid Load supply source When PV power is available 1 1st PV 2nd Battery 3rd Grid Default PV power will provide power to the load first If it s no...

Page 23: ...wer will back up 1st Battery 2nd Load When PV power is not available 1 1st Grid 2nd Battery Grid will provide power to the load at first If grid is not available battery power will provide power backu...

Page 24: ...id Battery power will provide power to the load at first If battery power is running out grid will back up the load NOTE This option will become ineffective during AC charging time and the priority wi...

Page 25: ...lowed to discharge Icon flashing indicates the battery voltage is too low Indicates AC output for loads is enabled and inverter is providing power to the connected loads Indicates AC output for loads...

Page 26: ...tery mode NOTE error occurs the buzzer will continuously sound You may press any button to mute it If backlight shuts off you may activate it by pressing any button When an 16 4 Query Menu Operation 1...

Page 27: ...ovide power to loads and then feed in to the grid PV power is sufficient to charge the battery first However remaining PV power is not sufficient to back up the load Therefore remaining PV power and t...

Page 28: ...Inverter mode without grid connected This inverter is working with DC INV operation and not connecting to the grid LCD Display Description PV power is sufficient to charge battery and provide power t...

Page 29: ...ia software from 50Vac to 60Vdc It can be adjusted via software from 50Vac to 60Vdc Charging process based on default setting 3 stages First max charging voltage increases to 56V S e c o n d c h a r g...

Page 30: ...er of batteries or battery packs The following precautions should be observed when working on batteries a Remove watches rings or other metal objects b Use tools with insulated handles c Wear rubber g...

Page 31: ...mains output in battery mode Battery discharges to shutdown point Battery is unconnected or too low Battery stops discharging when the grid is OK PV voltage is too high Inverter will cut off mains ou...

Page 32: ...oad fluctuates 1 Restart the inverter 2 If the error message still remains please contact your installer 34 INV voltage high Internal components failed Please contact your installer 35 Wire connection...

Page 33: ...e Maximum Battery Discharging Current Maximum Charging Current PHYSICAL 600 x 460 x 204 2 29 Dimension D X W X H mm Net Weight kgs GENERAL INTERACE RS 232 USB Optional SNMP Modbus and AS 400 cards ava...

Reviews: