36
4
PV input watt
4
The PV and Bus Voltage
4
The grid system
4
Enable auto test function
4
Communication Address of the inverter
4
Set Zigbee channal
4
The last 5dated failure reports
4
Set year/month/day/time
4
Parameters setting
7.1.4 Connecting messages
When inverter started to connect to grid, the following message will appear on
LCD screen.
Connect to gird interface