Figure 4-4-2-1 AC&DC Main Switch Status Schema
Procedure 2:
Open the front door. The unlock schema is shown in Figure 4-4-2-2.
Figure 4‐4‐2‐2 open front door of inverter
Procedure 3:
Raise the detents, and then close the doors. The schema is shown in Figure
4-4-2-3.