Step 4:
Rotate the left latch rightward until the notch locks
limiting pin, rotate the right latch leftward until
the notch locks limiting pin too.
2.3 Floor Standing Installation
320
320
Drilling Spot
Step 1
: Place battery in the to-be-installed area and mark
two drilling spots.
Note:
1. Keep a minimum distance of 320mm
between wall and battery.
2. Leave a minimum clearance of 133mm before
the front surface of battery.
Step 2
: Drill in the spots for at least 60mm. Clean the soil and
drive expansion tube into hole.
4
Drive M8 screw through notch of latch into wall.
Step 3:
Fix battery on bracket from the top down.
Note:
In order to guarantee a stable connect between
battery and bracket, please visually check if the
two upper joints are fixed. Try to move the
lower part of battery away from wall. The
connection is proved qualified if the battery
cannot be moved at all. Otherwise, please
connect the battery and bracket again until
confirming a fixed connect.
Shenzhen Growatt New Energy Technology CO.,LTD