background image

GR

-

UM

-

193

-

A

-

03

PV+

PV-

1

2

Customer

 

can

 

read

 

more

 

information

 

by push button.

Mark

Describe

Explain

Touch mark

Single touch

Switch the display interface or the 

current number plus 1

Double touch

Enter the setting state or confirm

Triple touch

Return to the previous display interface

Long press for 5s

Confirm Country setting or Number 

recover default value

Inverter status indicator

Red

Fault

Green

Normal operation

Red light flashing

Warning

It can display the basic information of inverter through OLED display screen 
(PV/AC voltage,PV power,ACcurrent,total power,generating capacity, etc.).

9.

8.

Note:
1.Before  installing  the  PV  terminal,  please 
double-check  that  the  PV  input  voltage  and 
current do not exceed the MPPT limits.
2.When  installing  the  PV  terminal,  pay 
attention  to  the  difference  between  the 
positive and negative poles and the one-to-
one correspondence between the terminals 
and the machine.
3.There is a "click" sound when the terminal 
is  connected,please  gently  pulling  the  PV 
wire  to  make  sure  there  is  no  loose  or 
pulling off.

3.3.3 Communication cable installation

Click

Download
Manual

Growatt New Energy

3.3.2 Plug in PV terminal

The

 

Inverter

side

The

 

Inverter

side

Unclock the housing

Click!

Click!

Connecting Meter

4.

The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter:

Meter Pin NO.

Description

Meter Connection

1

2

3

4

5

6

L-in

L-out

N-in

N-out

RS485A

RS485B

Grid L

AC connector & Load L

Grid N

AC connector & Load N

COM Pin 7 RS485A2

COM Pin 8 RS485B2

Note:

6.

Power on and off steps

5.

Post-installation check

No.

Acceptance criteria

No.

Acceptance criteria

1

The inverter is installed correctly, firmly and reliably.

6

The RS485 communication cable is installed correctly and firmly.

2

The ground wire connected well and the connection is firm 
and reliable.

7

The cable tie port is trimmed well without leaving sharp 
corners,meets the requirements of the user. 

3

All switches are in the OFF state.

8

All exposed terminals are well protected and there are no vacant 
ports.

4

All wiring is correct and securely connected.

9

Pay attention to clean up all construction residues.

5

The wiring of the cable is reasonable, meets the 
requirements, and there is no phenomenon of broken skin.

7.

Status of PV grid inverter

Service and contact

Export limitation setting

Exporlimit
OFF    

 ON

Password
123

Set parameter

  General

Advanced

Meter

   CT

ExportLimit Rate
     XXX.X%

Set OK

Under the permission given by your energy 
provider, the ratio of your system output 
power divided by the rated power of the 
inverter is called Export Limit Rate. For 
instance, if the energy provider only 
accepts 2.4kW from your 3kW system, then 
the Export Limit Rate of 3kW inverter is 
80.0%. 

1

The Inverter
side

The Inverter
side

The Inverter
side

COM Port Pin Definitions

COM Port

Definition

1

NA

This pin is no signal

2

NA

3

RS 485A1

Signal for communication

4

RS 485B1

5

CT-P

Signal for export limitation
(Optional)

6

CT-N

7

RS 485A2

Signal for smart meter

8

RS 485B2

DRM port Pin Definitions

RJ45 Plug

RRCR Definition

Active 
power

DRM Definition

1

K1

 – 

Relay

 

1

 

output

0

DRM5

2

K2

 – 

Relay

 

1

 

output

30%

DRM6

3

K3

 – 

Relay

 

1

 

output

60%

DRM7

4

K4

 – 

Relay

 

1

 

output

100%

DRM8

5

Relays common node

/

REFGEN

6

Not

 

connecte

/

COM/DRM0

7

Not

 

connected

/

/

8

Not

 

connected

/

/

1.When laying out signal cables, separate them from power cables to avoid strong signal interference sources
2.Do not mix the connector to the DRM port and the connector to the COM port.

Note

1

2

3

4

5

6

7

8

K1

K2

K3

K4

1 2345678

RJ45 Plug

RRCR

Note: 

For Australian market, installers can connect pin3 or pin4 to the neutral links/bars.

Before

 

turning

 

the

 

inverter

 

on

please

 

make

 

sure

 

the

 

PV

 

input

 

voltage

 

and

 

current

 

are

 

within

 

the

 

MPPT

 

limits

Follow

 

the

 

steps

 

below

 

to

 

turn

 

the

 

inverter

 

on

:

1

.

Switch

 

on

 

the

 

build

-

in

 

DC

 

isolator

 

at

 

the

 

bottom

 

of

 

the

 

inverter

.

2

.

Switch

 

on

 

the

 

PV

 

Array

 

and

 

DC

 

isolator

 

next

 

to

 

your

 

inverter

if

 

you

 

can

 

not

 

find

 

this

 

switch

skip

 

this

 

step

.

3

.

Switch

 

on

 

the

 

Solar

 

AC

 

isolator

 

if

 

the

 

inverter

 

is

 

more

 

than

 

3

 

meters

 

away

 

from

 

your

 

switchboard

.

4

.

Switch

 

on

 

the

 

solar

 

supply

 

main

 

switch

 

in

 

the

 

switch

 

board

.

To

 

shut

 

down

 

your

 

system

follow

 

this

 

guide

 

in

 

reverse

 

order

Shenzhen Growatt New Energy Co., Ltd

4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave,Bao’an District, Shenzhen, China

 +86 0755 2747 1942

www.ginverter.com

T
E

W

service@ginverter.com

Reviews: