Verifying the Installation
1.The MIN 2500-6000TL-XE is installed correctly and securely.
2.The Monitor is installed correctly and securely.
3.The Ground cable is connected correctly and securely.
4.The DC switch and all the switches connecting to the MIN 2500-6000TL-XE are OFF.
5.The AC output power cable, DC input power cable and signal cable are connected correctly and securely.
6.Unused terminals and ports are locked by watertight caps.
5.
1.When laying out signal cables, separate them from power cables to avoid strong signal interference sources.
2.Do not confuse the connector to the COM port and the connector to the SYS COM port.
3.The COM port Aonly provides a functional port-PCI or DRM.
Notice
:
NO
1
2
3
4
Function
Connect
to RRCR
+12V
GND
Not connected
Relay contact
2 input
Relay contact
3 input
Relay contact
4 input
GND
Relay contact
1 input
Not connected
Not connected
K2- output
K3- output
K4- output
Relays common
node
K1- output
5
6
7
8
COM Port Pin Definitions- Power Control Interface(PCI).
Connecting Meter
4.
The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter:
The following table describes how we can connect CHINT meter (DDSU666) to inverter:
Meter Pin NO.
Description
Connect to Inverter
1
2
3
4
7
8
L-in
L-out
N-in
N-out
RS485A
RS485B
/
AC connector & Load L
/
AC connector & Load N
Meter Pin NO.
Description
Connect to Inverter
1
2
3
4
5
6
L-in
L-out
N-in
N-out
RS485A
RS485B
/
AC connector & Load L
/
AC connector & Load N
SYS COM Pin 5 RS485A1
SYS COM Pin 5 RS485A1
SYS COM Pin 6 RS485B1
SYS COM Pin 6 RS485B1
Powering On the System
Touch button
Single touch
Double touch
Three touch
Hold 5s
Description
Switch display or 1
Enter
Previous menu
Confirm Country setting or
Number recover default value
6.
Step1: Turn on the AC switch between the MIN 2500-6000
TL-XE and the AC Grid.
Step2: Turn on the DC switch at the bottom of the MIN 2500-
6000TL-XE.
Step3: When the OLED show “Country/Area”, Please Set
the country follow the below step otherwise skip all steps.
Step4: Single touch to switch Country, such as
Step5:
Press the touch key for 5s,the OLED shows Country setting is
complete.
Set
OK
Tips:
1.If the LED light is green, the system is operating normally.
2.You can reset the country by “Country/Area” in the submenu of “Set parameter”.
Country/Area
Country/Area
N4105
VDE0126
Export limitation setting
7.
Exporlimit
OFF
ON
Meter
CT
Set OK
Set parameter
General
Advanced
Password
123
ExportLimit Rate
XXX.X%
Under the permission given by your energy provider, the ratio of your system output power divided by the rated power of the inverter is called
Export Limit Rate. For instance, if the energy provider only accepts 4kW from your 5KW system, then the Export Limit Rate of 5kW inverter is
80.0%.
5
6
5
6
LOAD
LOAD
4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave,Bao’an District, Shenzhen, China
8.
Service and contact
Shenzhen Growatt New Energy Co., Ltd
4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave,Bao’an District, Shenzhen, China
+86 0755 2747 1942
www.ginverter.com
T
E
W
service@ginverter.com