Verifying the Installation

1.The MIN 2500-6000TL-XE is installed correctly and securely.

2.The Monitor is installed correctly and securely.

3.The Ground cable is connected correctly and securely.

4.The DC switch and all the switches connecting to the MIN 2500-6000TL-XE are OFF.

5.The AC output power cable, DC input power cable and signal cable are connected correctly and securely.

6.Unused terminals and ports are locked by watertight caps.

5.

1.When laying out signal cables, separate them from power cables to avoid strong signal interference sources.
2.Do not confuse the connector to the COM port and the connector to the SYS COM port.
3.The COM port Aonly provides a functional port-PCI or DRM.

Notice

NO

1

2

3

4

Function

Connect
to RRCR

+12V

GND

Not connected

Relay contact
2 input

Relay contact 
3 input

Relay contact
4 input

GND

Relay contact
1 input

Not connected

Not connected

K2- output

K3- output

K4- output

Relays common
node

K1- output

5

6

7

8

COM Port Pin Definitions- Power Control Interface(PCI).

Connecting Meter

4.

The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter:

The following table describes how we can connect CHINT meter (DDSU666) to inverter:

Meter Pin NO.

Description

Connect to Inverter

1

2

3

4

7

8

L-in

L-out

N-in

N-out

RS485A

RS485B

/

AC connector & Load L

/

AC connector & Load N

Meter Pin NO.

Description

Connect to Inverter

1

2

3

4

5

6

L-in

L-out

N-in

N-out

RS485A

RS485B

/

AC connector & Load L

/

AC connector & Load N

SYS COM Pin 5 RS485A1

SYS COM Pin 5 RS485A1

SYS COM Pin 6 RS485B1

SYS COM Pin 6 RS485B1

Powering On the System

Touch button

Single touch

Double touch

Three touch

Hold 5s

Description

Switch display or 1

Enter 

Previous menu

Confirm Country setting or

Number recover default value

6.

Step1: Turn on the AC switch between the MIN 2500-6000
TL-XE and the AC Grid.
Step2: Turn on the DC switch at the bottom of the MIN 2500-
6000TL-XE.
Step3:  When  the  OLED  show  “Country/Area”,  Please  Set 
the country follow the below step otherwise skip all steps.

 

Step4: Single touch to switch Country, such as 

 

Step5:

 Press the touch key for 5s,the OLED shows Country setting is 

complete.

 

Set

 

OK

Tips:

1.If the LED light is green, the system is operating normally.
2.You can reset the country by “Country/Area” in the submenu of “Set parameter”.

Country/Area            

Country/Area       

N4105

VDE0126

Export limitation setting

7.

Exporlimit

OFF

     ON

Meter

CT

Set OK

Set parameter

General

Advanced 

Password

123

ExportLimit Rate

XXX.X%

Under the permission given by your energy provider, the ratio of your system output power divided by the rated power of the inverter is called 
Export Limit Rate. For instance, if the energy provider only accepts 4kW from your 5KW system, then the Export Limit Rate of 5kW inverter is 
80.0%. 

5

6

5

6

LOAD

LOAD

4-13/F,Building A,Sino-German(Europe) Industrial Park,

Hangcheng Ave,Bao’an District, Shenzhen, China

8.

Service and contact

Shenzhen Growatt New Energy Co., Ltd

4-13/F,Building A,Sino-German(Europe) Industrial Park,

Hangcheng Ave,Bao’an District, Shenzhen, China

 +86 0755 2747 1942

www.ginverter.com

T
E

W

service@ginverter.com

Reviews: