25
26
Information
The position of export limitation Meter must between the Inverter &
Load and gird.
Multiple inverter combination is not suitable in Australia.
The smart meter can be used only up to 2000m altitude.
Step 3 Push the threaded sleeve to connection terminal until both are locked tightly on
the inverter.
Step 1 Press the fasteners and pull it out from the inverter.
Step 2 Insert the H type tool and pull it out from the socket.
6.6 Grounding the inverter
The inverter must be connected to the AC grounding conductor of the power
distribution grid via the ground terminal (PE) .
The inverter side
The inverter side
This series inverter has integrated generation limitation control and export limitation
Functionality.The generation control function is used to control the active or apparent
power output levels of an inverter.The export limit control function for an inverter is used
to control the generation from an inverter to manage the export power level from an
electrical installation to the grid. To use this function, you can connect smart meter.The
smart meter model is Eastron SDM120CT-M(40mA).The primary aperture is
10mm,output cable length is 5m.The arrow on the CT must pointing towards the
inverter.The detailed information about the Meter,please refer to Annex -Eastron
SDM120CT-M(40mA) user manual.
A
B
C
D
E
F
Manufacturer
Eastron
Type
SDM120CT-M(40mA)
General Specifications
Voltage AC (Un)
Voltage Range
Base Current (Ib)
Power consumption
230V
176~276V AC
0.1V AC
<2W/10VA
Frequency
50/ 60Hz(±10%)
AC voltage withstand
4KV for 1 minute
Impulse voltage withstand
6KV-1.2uS waveform
Overcurrent withstand
20Imax for 0.5s
Pulse output 1
1000imp/kWh (default)
Pulse output 2
0.001(default) /0.01/0.1/1 kWh/kVArh
(configurable)
Display
Max. Reading
LCD with white backlit
999999kWh
Load
RS485