Connect the AC circuit breaker of the inverter.Then open the DC switch of the lithium
battery, the battery will be awakened, and the inverter will start automatically.
8.1
Startup the inverter
8.2
Shutdown the Inverter
Shut down the inverter step:
1. Disconect the line circuit breaker from single-phases grid and prevent it from being
reactivated.
2. Turn off the DC switch of the BAT.
3. Check the inverter operating status.
4. Waiting until LED, OLED have go out, the inverter is shut down.
Do not disconnect the BAT connectors under load.
DANGER
8 Startup and Shutdown the inverter
Maintenance and Cleaning 9
9.1 Checking Heat Dissipation
9.2 Cleaning the Inverter
9.3 Checking the DC Disconnect
If the inverter regularly reduces its output power due to high temperature, please
improve the heat dissipation condition. Maybe you need to clean the heat sink.
If the inverter is dirty, turn-off the AC breaker,DC switch and the BAT input switch
,waiting the inverter shut down ,then clean the enclosure lid, the display, and the LEDs
using only a wet cloth. Do not use any cleaning agents (e.g. solvents or abrasives).
Check for externally visible damage and discoloration of the DC Disconnect and the
cables at regular intervals.If there is any visible damage to the DC Disconnect, or visible
discoloration or damage to the cables, contact the installer.
WARNING
Prior to removal of any cover for maintenance or repair, turn off the
switch on the AC and DC sides