27
28
The inverter side
Step 3
Push the threaded sleeve to connection terminal until both are locked tightly on the
inverter.
Uninstall signal connector
Step 1
Press the fasteners and pull it out from the inverter.
Step 2 Insert the H type tool and pull it out from the socket
6.8 Active power control with smart meter , ripple control signal
receiver
Information
The position of export limitation Meter must between the Inverter & Load
and gird.
Multiple inverter combination is not suitable in Australia.
The smart meter can be used only up to 2000m altitude.
This series inverter has integrated generation limitation control and export limitation
Functionality.The generation control function is used to control the active or apparent power output
levels of an inverter.The export limit control function for an inverter is used to control the generation
from an inverter to manage the export power level from an electrical installation to the grid. To use
this function, you can connect smart meter.The smart meter model is Eastron SDM120CT-
M(40mA).The primary aperture is 10mm,output cable length is 5m.The arrow on the CT must
pointing towards the inverter.The detailed information about the Meter,please refer to Annex -Eastron
SDM120CT-M(40mA) user manual.
6.7 Grounding the inverter
The inverter must be connected to the AC grounding conductor of the power
distribution grid via the ground terminal (PE) .
WARNING
Because of the transformerless design, the DC positive pole and DC
negative pole of PV arrays are not permitted to be grounded.
Manufacturer
Eastron
Type
SDM120CT-M(40mA)