5
6
3
Installation
3.1 Unpacking and Inspection
3.2 Basic installation requirements
Before installation, please inspect the unit. Be sure that nothing inside the package is
damaged. You should have received the following items inside of package:
The unit x1
User manual x1
1 meter long cable x1
Setscrews x3
1.The installation location must be suitable for Solar Charger 3500 weight for a long
period time.
2.The installation location must conform with dimension of Solar Charger 3500.
3.Do not mount the solar charger on flammable construction material .
4.The Ingress Protection rate is IP20 and the pollution degree is PD2, The install area
shall be generally conditioned in term of temperature, humidity and air filtration.
5.Battery installation option is not far below the position of energy storage machine.
6.The humidity of the installation location should be 5 ~ 85%.
7.The ambient temperature should be 0
℃
~55
℃
.
8.Solar Charger 3500 can be installed in vertical or lean back on plane, Please refer to
the below Installation position shall not prevent access to the disconnection means.
Figure 3.1
9.In order to ensure machine can run normally and easy to operate, please pay
attention to provide adequate space for Solar Charger 3500. Please refer to below:
Figure 3.2
10.Do not install the machine near television antenna or any other antennas and
antenna cables.
11.Don't install the machine in the living area.
12.Be sure that the machine is out of the children's reach.
13.Install the unit by screwing three crews as below. It's recommended to use M6
screws.
Figure 3.3