background image

37

38

Chart 6.5 

If you choose CEI and used SPA inverter in Italy, SPA inverter have Auto Test function. 

How to use the Autotest functions. Please see the annex. 

6.4.4 work mode set up 

You  can  enter  set  up  page  by  long  press  “enter”  for  3S,  in  this  page,  you  can  press 
“enter” or “ESC” for 1S to finish the selection, the page shows like following:

 

 

 

 

 

Basic Parameter

WorkMode

WorkMode

Configuration

WorkMode

Priority

WorkMode

EPS

Press 

enter

key more than 

3 seconds into setup mode

Press 

down

 key 

to the next item 

Press 

enter

 key more 

than 1 seconds to make sure

Mode Change

WorkMode

ExportLimit

WorkMode

Auto Test

WorkMode

Default Set

WorkMode

DiagnoseFun

WorkMode

RS485 Seting

WorkMode

Country/Area

WorkMode

Dry Connect

WorkMode

Chart 6.6 

Chart 6.7 

 

1.Under the Basic Para, you can see the setup options below after pressing Enter for 1S

In the basic Parameter, you can set language (English, Italian, German), system time, 
Lead-acid LV(minimum voltage of single battery, default is 11.5V), Lead-acid 
CC(maximum battery charge&discharge current , default is 25A), Lead-acid 
CV(maximum voltage of single battery, default is 14.5V), Lead-acid Number(number of 
connected batteries, default is 12).

2.Under the EPS, you can see the setup options below after pressing Enter for 1S:

WorkMode

Language

WorkMode

English

Italiano

Deutsch

WorkMode

System time

WorkMode

xxxxY/xxM/xxD  XX :XX

WorkMode

Lead-acid LV

WorkMode

11.5 V

WorkMode

Lead-acid CC

WorkMode

25 A

三级

WorkMode

Lead-acid CV

WorkMode

14.5V

WorkMode

RS485 Addr

WorkMode

COM Address :

1

三级

WorkMode

Lead-acid Number

WorkMode

12

Basic Parameter

WorkMode

Press  “Enter ” key 
more than  1 seconds 
to make sure

Press  “Enter” key 
more than  1 seconds 
to make sure

Press  “Down ” 
key to the 
next item

Only display 
when battery 
type is lead -
acid

Range from  10 to 
12V, and the 
accuracy is  0.1V

Range from  1 to 
25A, and the 
accuracy is  1A

Range from  12 to 
15V, and the 
accuracy is  0.1V

Can only be set to 
12/18/24/36

WorkMode

                 

EPS

WorkMode

WorkMode

WorkMode

EPS: Enable         

                Disable

ACVolt:   230   V 

240

208

WorkMode

AC Freq:  50 Hz
                 60

Press 

down

key to the next item 

Press 

enter

key to 

make sure 

WorkMode

WorkMode

N_PE Relay :   ON

OFF

WorkMode

WorkMode

Bypass: ON

OFF

Summary of Contents for SPA 10000TL3 BH-UP

Page 1: ...Growatt New Energy Co Ltd 4 13 F Building A Sino German Europe Industrial Park Hangcheng Ave Bao an District Shenzhen China GR UM 245 A 01 86 0755 2747 1942 www ginverter com T E W service ginverter...

Page 2: ...e Use 2 2 Safety Measure 2 3 Symbols introduction on the SPA inverter 1 1 Preface 1 2 Target Group 1 3 Product Description 1 4 Safety Instructions 3 Product Description 4 Unpacking 5 Installation 5 1...

Page 3: ...ter 12 1 Growatt SPA series energy storage machine product specification 12 2 DC input terminal parameter 12 3 Torque 12 4 Appendix 11 Decommissioning 6 Commissioning 12 Product specification 7 1 Star...

Page 4: ...odel it will be dangerous Installer can install energy storage machine of Growatt SPA TL3 BH UP Series rapidly and troubleshooting build communication system through read this manual carefully If you...

Page 5: ...battery use We must make sure ventilation of the service environment and temperature control in order to prevent the danger of battery explosion Battery recommended installation environment must be st...

Page 6: ...uctor terminal Direct Current DC Alternating Current AC Refer to the operating instructions The machine complies with the requirements of the applicable CE guidelines Max output apparent power Nominal...

Page 7: ...ngress Protection Operation Ambient Temperature Certificates Number Growatt SPA 10000TL3 BH UP 10000W 10000VA 3W N PE 230 400Vac 15 2A 50Hz 60Hz 0 8 leading 0 8 lagging 10000W 230 400Vac 50Hz 60Hz 100...

Page 8: ...rew Ground terminal M4 setscrew Installation 5 5 1 Basic installation requirements A The installation location must be suitable for SPA s weight for a long period time B The installation location must...

Page 9: ...pace into account about the dimensions please reference user manual N The Inflammable and explosive dangerous goods must not be placed around battery in case of cause serious danger 5 2 Installation r...

Page 10: ...ge of the cardboard is horizontal 3 Mark four points at the wall via the hole of the paper board then remove the cardboard 4 Drill four 8 holes at the mark point the depth is not less than 55mm 5 Knoc...

Page 11: ...ndicates on it and tighten the screws Chart 5 11 Chart 5 12 Chart 5 13 Step 3 Push threaded sleeve on to connection terminal until both are locked tightly Step 4 Plug the socket into AC output termina...

Page 12: ...g the AC terminal into the inverter AC port Chart 5 15 Chart 5 16 Chart 5 17 Chart 5 18 Chart 5 19 Chart 5 20 The recommended wiring diagram is as follows Note This diagram is an example for gird syst...

Page 13: ...load type devices such as hair dryers 19 20 Chart 5 22 5 4 3 Connection of battery terminal Similar to the traditional inverter connecting the input of battery can be realized by using MC4 terminal th...

Page 14: ...meter user manual Chart 5 23 Chart 5 24 21 Chart 5 25 Chart 5 26 Remark Meter wire 15m in length specification RJ45 standard LAN line one end with 8P modular plug the other connected with transformer...

Page 15: ...l nut over the RS485 cable Step3 Press the cable support sleeve out of the cable gland Step4 Remove the filler plug from the cable support sleeve Step5 Route the RS485 cable through an opening in the...

Page 16: ...re probe for lead acid battery When customer using lead acid battery the temperature probe of the lead acid battery is used to detect the ambient temperature of the lead acid battery the battery tempe...

Page 17: ...ivel nut from the cable gland Step2 Thread the swivel nut over the cable Step3 Press the cable support sleeve out of the cable gland Step4 Remove the filler plug from the cable support sleeve Step5 Ro...

Page 18: ...e period but if you use website settings you can set up to three periods of the priority mode Refer to 6 4 4 Load first Load first is the default mode With inverter in the SPA system energy from inver...

Page 19: ...normal mode otherwise it will go to fault mode 6 2 5 Standby mode If the system hasn t faults while the condition is not qualified SPA would stay at standby mode With inverter in the SPA system batte...

Page 20: ...AU_Ausgrid GT4XXXXXX6 AU_Endeavour GT4XXXXXX7 AU_Ergon_Energy GT4XXXXXX8 AU_Energex GT4XXXXXX9 AU_sa_network GT4XXXXXXA Brazil Brazil GT1XXXXXX5 NULL Brazil 240V NULL Mexico Mexico NULL India India GT...

Page 21: ...ess up button command will go back Workmode depend on the situation If SPA is normal state it will show normal If SPA is standby state it will show as standby etc Some special definitions are explaine...

Page 22: ...ad acid CC maximum battery charge discharge current default is 25A Lead acid CV maximum voltage of single battery default is 14 5V Lead acid Number number of connected batteries default is 12 2 Under...

Page 23: ...cy is 1 Range from 5 to 100 and the accuracy is 1 Press down key to the next item Press down key to the next item Choose OK to the next item Choose OK to the next item Bat First Grid First NO Disable...

Page 24: ...takes effect 2 When the ExportLimit is set to ON and the SingleLimit is ON the phase level export limit function takes effect 3 LoadFstCtrl has two modes SiEn and ThEn If it is set to SiEn the phase l...

Page 25: ...Run 000 min WorkMode OnDelay 00min WorkMode MinRun 000 min WorkMode Heater OK WorkMode Generator OK WorkMode TurnOff P 000W WorkMode TurnOff P 000W D Mix WorkMode Dry Connect Generator Disable NO D Ex...

Page 26: ...3 L1 N N E E Battery PE Electic meter1 L2 L1 L3 L2 UPS Load E L1 L2 L3 N L2 L1 Load L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N METER 485 1 or 485 2 PV Inverter ACGRID L3 L2 L1 N E Electic meter2 Chart 6 19 As t...

Page 27: ...cial website of Growatt Chart 6 21 ShineBus Chart 6 22 47 48 Chart 6 23 Chart 6 24 Chart 6 25 The wiring diagram is as follows 6 5 3 The SPA s monitoring The SPA provide RS485 interface Users can thro...

Page 28: ...necting or disconnecting battery terminals f Determine if battery is inadvertently grounded If inadvertently grounded remove source from ground Contact with any part of a grounded battery can result i...

Page 29: ...t solve the problem BMS COM Fault Communication fault 1 Check the lithium Battery is open or not 2 Check the connection of lithium Battery and inverter is good or not Battery reversed Battery termina...

Page 30: ...ification or not EU Declaration of Conformity 10 With the scope of EU directives 2014 35 EU Low Voltage Directive LVD 2014 30 EU Electromagnetic Compatibility Directive EMC 2011 65 EU RoHS Directive a...

Page 31: ...e 10ms Battery data DC Battery voltage range 100 550V Max charging discharging current 25A Continuous charging discharging power 4000W 5000W 6000W 7000W 8000W 10kW Type of battery lithium battery Lead...

Page 32: ...he Growatt New Energy Technology Co Ltd or dealer orders P N is only for reference and it may be changed Upper cover screws Shell Dc connector M6 screwdriver Grounding screw 1 3Nm 10 8 1bf in 0 7Nm 6...

Page 33: ...to 6 4 4 in the set up surface of Auto Test Press the enter key make sure to start auto test by press enter key 3 seconds The LCD will display the follow message 59 S2 Limit Waiting to start 264 5 V...

Reviews: