background image

Note

1

.

After

 

each

 

step

 

of

 

the

 

test

 

is

 

OK

the

 

LCD

 

displays

 

PASS

wait

 

for

 

10s

 

and

 

then

 

proceed

 

to

 

the

 

next

 

test.

2

.

After

 

detecting

 

Fail

you

 

need

 

to

 

press

 

OK

 

to

 

exit.

3

.

When

 

all

 

the

 

tests

 

are

 

completed

you

 

need

 

to

 

press

 

the

 

OK

 

key

 

to

 

confirm

 

and

 

exit.

4.Disconnect PV, EPS, Load ,Turn on BAT and Grid only, and than run the DiagnoseFun.

When DiagnoseFun fails, please press OK button and check the table below to confirm 

the cause of the problem.

Error Message

Description

Suggestion

Meter1CommFail

Meter1 communication 
fault

Check the communication line 
between meter1 and inverter is 
good or not.

BattChrOrDisFail

The battery cannot 
charge or discharge 

normally

Check if there are Battery or BMS 

related error messages on the LCD.

M1AbnormalWire

Meter1 wiring error

Check if the phase sequence of 

Meter1 power line is correct.

Meter2CommFail

Meter2 communication 

fault

Check the communication line 

between meter2 and inverter is 

good or not.

6.Under the Export Limit, you can see the setup options below after pressing Enter:

ExportLimit

WorkMode

WorkMode

ExportLimit: ON

                       

OFF         

      

WorkMode

PowerRate:00.0%          

WorkMode

Failsafe:ON

               OFF

              

WorkMode

SingleExport  :ON

OFF         

      

Press “enter”
key to make sure 

Range from 00.0% to 
100.0% And the accuracy 
is 0.1%; Default value 
is 00.0%

Only displayed when 

Safety regulations are 
G98/G99 and meter mode

Press “down” key 
to the next item 

WorkMode

LoadFstCtrl:SiEn

LoadFstCtrl:ThEn

LoadFirstControl

Chart 6.11

41

42

Note:
1.When the ExportLimit is set to ON and the SingleLimit is OFF, the total Export Limit 
function takes effect.
2.When the ExportLimit is set to ON and the SingleLimit is ON, the phase-level export 
limit function takes effect.
3.LoadFstCtrl has two modes: SiEn and ThEn. If it is set to SiEn, the phase-level power 
control function takes effect in LoadFirst mode, the AC power output will operate 
according to the exact load consumption in each phase. If it is set to ThEn, the total 
three-phase power control function takes effect in LoadFirst mode, the AC power output 
will operate according to the total three-phase power consumption.

ExportLimit function is used by the user to control the power feeding  into the grid. 
When this function is enabled, the feeding power to the grid will be equal to or less than 
the set value. The purpose of the fail-safe function is to ensure that in the event of a 
failure of export limit function, the active power output will drop to the allowable output 
within a specified time.

Note:

Ÿ

The default value is 0.00%.

Ÿ

The total exprot limit function takes effect only when ExportLimit is enabled

.

Ÿ

The sphase-level export limit function will only take effect when the SingleLimit and 

ExportLimit are enabled at the same time

.

7. Under the RS485 setting, you can choose RS485 communication mode after pressing 

Enter:

RS485  Seting

WorkMode

Port

Shinemaster

            Meter2

          VPP

unused

WorkMode

Chart 6.12

Note:

Ÿ

Default mode is unused.

Ÿ

In ShineMaster mode, SPA will enter parallel mode. At this time, it needs to be 

equipped with SEM-E and does not need to be connected to the meter. 

Ÿ

In Meter2 mode, SPA allows two meters to be connected. One is used to read the bus 

power, and the other is used to read the power of other inverters.

Ÿ

In VPP mode, SPA allows access to external controllers to make relevant settings for 

SPA.

Summary of Contents for SPA 10000TL3 BH-UP

Page 1: ...Growatt New Energy Co Ltd 4 13 F Building A Sino German Europe Industrial Park Hangcheng Ave Bao an District Shenzhen China GR UM 245 A 01 86 0755 2747 1942 www ginverter com T E W service ginverter...

Page 2: ...e Use 2 2 Safety Measure 2 3 Symbols introduction on the SPA inverter 1 1 Preface 1 2 Target Group 1 3 Product Description 1 4 Safety Instructions 3 Product Description 4 Unpacking 5 Installation 5 1...

Page 3: ...ter 12 1 Growatt SPA series energy storage machine product specification 12 2 DC input terminal parameter 12 3 Torque 12 4 Appendix 11 Decommissioning 6 Commissioning 12 Product specification 7 1 Star...

Page 4: ...odel it will be dangerous Installer can install energy storage machine of Growatt SPA TL3 BH UP Series rapidly and troubleshooting build communication system through read this manual carefully If you...

Page 5: ...battery use We must make sure ventilation of the service environment and temperature control in order to prevent the danger of battery explosion Battery recommended installation environment must be st...

Page 6: ...uctor terminal Direct Current DC Alternating Current AC Refer to the operating instructions The machine complies with the requirements of the applicable CE guidelines Max output apparent power Nominal...

Page 7: ...ngress Protection Operation Ambient Temperature Certificates Number Growatt SPA 10000TL3 BH UP 10000W 10000VA 3W N PE 230 400Vac 15 2A 50Hz 60Hz 0 8 leading 0 8 lagging 10000W 230 400Vac 50Hz 60Hz 100...

Page 8: ...rew Ground terminal M4 setscrew Installation 5 5 1 Basic installation requirements A The installation location must be suitable for SPA s weight for a long period time B The installation location must...

Page 9: ...pace into account about the dimensions please reference user manual N The Inflammable and explosive dangerous goods must not be placed around battery in case of cause serious danger 5 2 Installation r...

Page 10: ...ge of the cardboard is horizontal 3 Mark four points at the wall via the hole of the paper board then remove the cardboard 4 Drill four 8 holes at the mark point the depth is not less than 55mm 5 Knoc...

Page 11: ...ndicates on it and tighten the screws Chart 5 11 Chart 5 12 Chart 5 13 Step 3 Push threaded sleeve on to connection terminal until both are locked tightly Step 4 Plug the socket into AC output termina...

Page 12: ...g the AC terminal into the inverter AC port Chart 5 15 Chart 5 16 Chart 5 17 Chart 5 18 Chart 5 19 Chart 5 20 The recommended wiring diagram is as follows Note This diagram is an example for gird syst...

Page 13: ...load type devices such as hair dryers 19 20 Chart 5 22 5 4 3 Connection of battery terminal Similar to the traditional inverter connecting the input of battery can be realized by using MC4 terminal th...

Page 14: ...meter user manual Chart 5 23 Chart 5 24 21 Chart 5 25 Chart 5 26 Remark Meter wire 15m in length specification RJ45 standard LAN line one end with 8P modular plug the other connected with transformer...

Page 15: ...l nut over the RS485 cable Step3 Press the cable support sleeve out of the cable gland Step4 Remove the filler plug from the cable support sleeve Step5 Route the RS485 cable through an opening in the...

Page 16: ...re probe for lead acid battery When customer using lead acid battery the temperature probe of the lead acid battery is used to detect the ambient temperature of the lead acid battery the battery tempe...

Page 17: ...ivel nut from the cable gland Step2 Thread the swivel nut over the cable Step3 Press the cable support sleeve out of the cable gland Step4 Remove the filler plug from the cable support sleeve Step5 Ro...

Page 18: ...e period but if you use website settings you can set up to three periods of the priority mode Refer to 6 4 4 Load first Load first is the default mode With inverter in the SPA system energy from inver...

Page 19: ...normal mode otherwise it will go to fault mode 6 2 5 Standby mode If the system hasn t faults while the condition is not qualified SPA would stay at standby mode With inverter in the SPA system batte...

Page 20: ...AU_Ausgrid GT4XXXXXX6 AU_Endeavour GT4XXXXXX7 AU_Ergon_Energy GT4XXXXXX8 AU_Energex GT4XXXXXX9 AU_sa_network GT4XXXXXXA Brazil Brazil GT1XXXXXX5 NULL Brazil 240V NULL Mexico Mexico NULL India India GT...

Page 21: ...ess up button command will go back Workmode depend on the situation If SPA is normal state it will show normal If SPA is standby state it will show as standby etc Some special definitions are explaine...

Page 22: ...ad acid CC maximum battery charge discharge current default is 25A Lead acid CV maximum voltage of single battery default is 14 5V Lead acid Number number of connected batteries default is 12 2 Under...

Page 23: ...cy is 1 Range from 5 to 100 and the accuracy is 1 Press down key to the next item Press down key to the next item Choose OK to the next item Choose OK to the next item Bat First Grid First NO Disable...

Page 24: ...takes effect 2 When the ExportLimit is set to ON and the SingleLimit is ON the phase level export limit function takes effect 3 LoadFstCtrl has two modes SiEn and ThEn If it is set to SiEn the phase l...

Page 25: ...Run 000 min WorkMode OnDelay 00min WorkMode MinRun 000 min WorkMode Heater OK WorkMode Generator OK WorkMode TurnOff P 000W WorkMode TurnOff P 000W D Mix WorkMode Dry Connect Generator Disable NO D Ex...

Page 26: ...3 L1 N N E E Battery PE Electic meter1 L2 L1 L3 L2 UPS Load E L1 L2 L3 N L2 L1 Load L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N METER 485 1 or 485 2 PV Inverter ACGRID L3 L2 L1 N E Electic meter2 Chart 6 19 As t...

Page 27: ...cial website of Growatt Chart 6 21 ShineBus Chart 6 22 47 48 Chart 6 23 Chart 6 24 Chart 6 25 The wiring diagram is as follows 6 5 3 The SPA s monitoring The SPA provide RS485 interface Users can thro...

Page 28: ...necting or disconnecting battery terminals f Determine if battery is inadvertently grounded If inadvertently grounded remove source from ground Contact with any part of a grounded battery can result i...

Page 29: ...t solve the problem BMS COM Fault Communication fault 1 Check the lithium Battery is open or not 2 Check the connection of lithium Battery and inverter is good or not Battery reversed Battery termina...

Page 30: ...ification or not EU Declaration of Conformity 10 With the scope of EU directives 2014 35 EU Low Voltage Directive LVD 2014 30 EU Electromagnetic Compatibility Directive EMC 2011 65 EU RoHS Directive a...

Page 31: ...e 10ms Battery data DC Battery voltage range 100 550V Max charging discharging current 25A Continuous charging discharging power 4000W 5000W 6000W 7000W 8000W 10kW Type of battery lithium battery Lead...

Page 32: ...he Growatt New Energy Technology Co Ltd or dealer orders P N is only for reference and it may be changed Upper cover screws Shell Dc connector M6 screwdriver Grounding screw 1 3Nm 10 8 1bf in 0 7Nm 6...

Page 33: ...to 6 4 4 in the set up surface of Auto Test Press the enter key make sure to start auto test by press enter key 3 seconds The LCD will display the follow message 59 S2 Limit Waiting to start 264 5 V...