6
.
1
Commissioning of SPA
6
.
2
Operation modes
6
.
3
Country setting
6
.
4
Display and button
6.5 Communication
11.1 Dismantling the energy storage
11.2 Packing the SPA inverter
11.3 Storing SPA inverter
11.4 Disposing of theSPA inverter
12.1 Growatt SPA series energy
storage machine product specification
12.2 DC input terminal parameter
12.3 Torque
12.4 Appendix
11
Decommissioning
6 Commissioning
12 Product specification
7
.
1
Start-up the SPA system
7
.
2
Disconnect
the
SPA system
7
Start-up and shut down
SPA system
13
Certificate
14 Contact
9
Fault removal
8
Attention of the installation
environment, maintenance
and cleaning
10 EU Declaration of Conformity