EPS Volt Low

EPS output voltage low

1.Check the load of EPS. If overload 
occurred, reduce load.
2.Restart inverter again. 

Error message

Error message

Description

Suggestion

Error 411

Internal communication failed

1.Restart inverter.
2.Please contact Growatt service 
center if restart can't solve the 
problem.

Error 418

DSP and COM firmware version 
unmatch, system fault.

1.Read DSP and COM firmware 
version from LCD or shinebus.
2.Check if the firmware is correct.

Error 303

Inverter L N reversed or ground 

failed

1.Check the connection of battery  

and inverter is good or not.

2.Check the PE of inverter is good or 

not.

Error 405

Relay fault

1.Restart inverter.
2.Please contact Growatt service 
center if restart can't solve the 
problem.

Error 407

Autotest failed

(only in Italy)

1.Restart inverter.

2.Please contact Growatt service 

center if restart can't solve the 

problem.

OP Short Fault

EPS Output Short Fault

1.Check the load of EPS.
2.Check the output of EPS. Especial 
not connect to grid.

NTC Open

Internal temperature failed

Please contact Growatt service 

center.

Error 406

Model set up not meet with 
certification

Please check model set or check the 
DIP setting.

Residual I High

Leakage current too high

1.Check the cable of inverter.

2.Restart inverter.

3.Please contact Growatt service 

center if restart can't solve the 

problem.

Error 408

Temperature over range

Please check the temperature is in 
the range of specification or not.

EU Declaration of Conformity 10    

With the scope of EU directives:
•2014/35/EU Low Voltage Directive (LVD)
•2014/30/EU Electromagnetic Compatibility Directive (EMC)
•2011/65/EU RoHS Directive and its amendment (EU)2015/863
Shenzhen Growatt New Energy Technology Co. Ltd confirms that the Growatt inverters 
and accessories described in this document are in compliance with the above mentioned

EU directives. The entire EU Declaration of Conformity can be found at www.ginverter.com.

1.Disconnect the SPA inverter such as mentioned in section 7.
2.Disconnect the upper cable of SPA inverter.

Watch out the SPA's shell heat and prevent to scald

Wait 20 minutes until the SPA cooling and then to disassembly!

3.Unscrew all the connecting cable.
4.Unscrew the radiator and wall-mounted anchor screw and then take down the 
machine from wall.

11.2 Packing the SPA inverter

Usually placed SPA inverter in the packing box with tape sealing, If the SPA inverter 

cannot reoccupy, You can choose a cheap carton for packaging. Carton requirements 

must meet the size of the inverter and can support energy storage machine overall 

weight.

11.3 Storing SPA inverter

Store SPA inverter in a dry place where ambient temperatures are always between -25°C 

and +60°C.

11.4 Disposing of the SPA inverter

Do not dispose of SPA inverter together with household waste. Please 

accordance with the disposal regulations for electronic waste which apply at 
the installation site at that time. Ensure that the old unit and, where 
applicable, any accessories are disposed of in a proper manner.

11.1 Dismantling the energy storage

Decommissioning 11  

Summary of Contents for SPA 10000TL3 BH-UP

Page 1: ...Growatt New Energy Co Ltd 4 13 F Building A Sino German Europe Industrial Park Hangcheng Ave Bao an District Shenzhen China GR UM 245 A 01 86 0755 2747 1942 www ginverter com T E W service ginverter...

Page 2: ...e Use 2 2 Safety Measure 2 3 Symbols introduction on the SPA inverter 1 1 Preface 1 2 Target Group 1 3 Product Description 1 4 Safety Instructions 3 Product Description 4 Unpacking 5 Installation 5 1...

Page 3: ...ter 12 1 Growatt SPA series energy storage machine product specification 12 2 DC input terminal parameter 12 3 Torque 12 4 Appendix 11 Decommissioning 6 Commissioning 12 Product specification 7 1 Star...

Page 4: ...odel it will be dangerous Installer can install energy storage machine of Growatt SPA TL3 BH UP Series rapidly and troubleshooting build communication system through read this manual carefully If you...

Page 5: ...battery use We must make sure ventilation of the service environment and temperature control in order to prevent the danger of battery explosion Battery recommended installation environment must be st...

Page 6: ...uctor terminal Direct Current DC Alternating Current AC Refer to the operating instructions The machine complies with the requirements of the applicable CE guidelines Max output apparent power Nominal...

Page 7: ...ngress Protection Operation Ambient Temperature Certificates Number Growatt SPA 10000TL3 BH UP 10000W 10000VA 3W N PE 230 400Vac 15 2A 50Hz 60Hz 0 8 leading 0 8 lagging 10000W 230 400Vac 50Hz 60Hz 100...

Page 8: ...rew Ground terminal M4 setscrew Installation 5 5 1 Basic installation requirements A The installation location must be suitable for SPA s weight for a long period time B The installation location must...

Page 9: ...pace into account about the dimensions please reference user manual N The Inflammable and explosive dangerous goods must not be placed around battery in case of cause serious danger 5 2 Installation r...

Page 10: ...ge of the cardboard is horizontal 3 Mark four points at the wall via the hole of the paper board then remove the cardboard 4 Drill four 8 holes at the mark point the depth is not less than 55mm 5 Knoc...

Page 11: ...ndicates on it and tighten the screws Chart 5 11 Chart 5 12 Chart 5 13 Step 3 Push threaded sleeve on to connection terminal until both are locked tightly Step 4 Plug the socket into AC output termina...

Page 12: ...g the AC terminal into the inverter AC port Chart 5 15 Chart 5 16 Chart 5 17 Chart 5 18 Chart 5 19 Chart 5 20 The recommended wiring diagram is as follows Note This diagram is an example for gird syst...

Page 13: ...load type devices such as hair dryers 19 20 Chart 5 22 5 4 3 Connection of battery terminal Similar to the traditional inverter connecting the input of battery can be realized by using MC4 terminal th...

Page 14: ...meter user manual Chart 5 23 Chart 5 24 21 Chart 5 25 Chart 5 26 Remark Meter wire 15m in length specification RJ45 standard LAN line one end with 8P modular plug the other connected with transformer...

Page 15: ...l nut over the RS485 cable Step3 Press the cable support sleeve out of the cable gland Step4 Remove the filler plug from the cable support sleeve Step5 Route the RS485 cable through an opening in the...

Page 16: ...re probe for lead acid battery When customer using lead acid battery the temperature probe of the lead acid battery is used to detect the ambient temperature of the lead acid battery the battery tempe...

Page 17: ...ivel nut from the cable gland Step2 Thread the swivel nut over the cable Step3 Press the cable support sleeve out of the cable gland Step4 Remove the filler plug from the cable support sleeve Step5 Ro...

Page 18: ...e period but if you use website settings you can set up to three periods of the priority mode Refer to 6 4 4 Load first Load first is the default mode With inverter in the SPA system energy from inver...

Page 19: ...normal mode otherwise it will go to fault mode 6 2 5 Standby mode If the system hasn t faults while the condition is not qualified SPA would stay at standby mode With inverter in the SPA system batte...

Page 20: ...AU_Ausgrid GT4XXXXXX6 AU_Endeavour GT4XXXXXX7 AU_Ergon_Energy GT4XXXXXX8 AU_Energex GT4XXXXXX9 AU_sa_network GT4XXXXXXA Brazil Brazil GT1XXXXXX5 NULL Brazil 240V NULL Mexico Mexico NULL India India GT...

Page 21: ...ess up button command will go back Workmode depend on the situation If SPA is normal state it will show normal If SPA is standby state it will show as standby etc Some special definitions are explaine...

Page 22: ...ad acid CC maximum battery charge discharge current default is 25A Lead acid CV maximum voltage of single battery default is 14 5V Lead acid Number number of connected batteries default is 12 2 Under...

Page 23: ...cy is 1 Range from 5 to 100 and the accuracy is 1 Press down key to the next item Press down key to the next item Choose OK to the next item Choose OK to the next item Bat First Grid First NO Disable...

Page 24: ...takes effect 2 When the ExportLimit is set to ON and the SingleLimit is ON the phase level export limit function takes effect 3 LoadFstCtrl has two modes SiEn and ThEn If it is set to SiEn the phase l...

Page 25: ...Run 000 min WorkMode OnDelay 00min WorkMode MinRun 000 min WorkMode Heater OK WorkMode Generator OK WorkMode TurnOff P 000W WorkMode TurnOff P 000W D Mix WorkMode Dry Connect Generator Disable NO D Ex...

Page 26: ...3 L1 N N E E Battery PE Electic meter1 L2 L1 L3 L2 UPS Load E L1 L2 L3 N L2 L1 Load L1 L2 L3 N L1 L2 L3 N L1 L2 L3 N METER 485 1 or 485 2 PV Inverter ACGRID L3 L2 L1 N E Electic meter2 Chart 6 19 As t...

Page 27: ...cial website of Growatt Chart 6 21 ShineBus Chart 6 22 47 48 Chart 6 23 Chart 6 24 Chart 6 25 The wiring diagram is as follows 6 5 3 The SPA s monitoring The SPA provide RS485 interface Users can thro...

Page 28: ...necting or disconnecting battery terminals f Determine if battery is inadvertently grounded If inadvertently grounded remove source from ground Contact with any part of a grounded battery can result i...

Page 29: ...t solve the problem BMS COM Fault Communication fault 1 Check the lithium Battery is open or not 2 Check the connection of lithium Battery and inverter is good or not Battery reversed Battery termina...

Page 30: ...ification or not EU Declaration of Conformity 10 With the scope of EU directives 2014 35 EU Low Voltage Directive LVD 2014 30 EU Electromagnetic Compatibility Directive EMC 2011 65 EU RoHS Directive a...

Page 31: ...e 10ms Battery data DC Battery voltage range 100 550V Max charging discharging current 25A Continuous charging discharging power 4000W 5000W 6000W 7000W 8000W 10kW Type of battery lithium battery Lead...

Page 32: ...he Growatt New Energy Technology Co Ltd or dealer orders P N is only for reference and it may be changed Upper cover screws Shell Dc connector M6 screwdriver Grounding screw 1 3Nm 10 8 1bf in 0 7Nm 6...

Page 33: ...to 6 4 4 in the set up surface of Auto Test Press the enter key make sure to start auto test by press enter key 3 seconds The LCD will display the follow message 59 S2 Limit Waiting to start 264 5 V...

Reviews: