1.1 Preface
1
2
1.2 Target Group
1.3 Product Description
1 Brief Introduction
This manual will provide the users who use the Growatt SPA TL3 BH-UP Series of
Shenzhen Growatt New Energy Co.,Ltd(Short for Growatt as below) with the detailed
product information and the installation instructions. Please read this manual carefully
and put this manual on some place where is convenient to installation, operation, obtain.
Any modifications of Growatt new energy, we will not notify the user.
Growatt SPA TL3 BH-UP inverter must be installed by professional electrical personnel
who have obtained the certification of the relevant departments. We have two kinds of
energy storage machine for different battery one is for lithium battery and the other is
for lead-acid battery, we suggest: customer should decide which kind of energy storage
machine you want, Growatt can provide only lithium battery with energy storage
machine, customer can choose lead-acid energy storage machine with no battery provide
by Growatt while they can buy these battery from market easily. Especially if customer
choose energy storage system with lithium battery(which must be provide by Growatt)
but used for lead-acid battery or used lead-acid battery for lithium battery model, it will
be dangerous. Installer can install energy storage machine of Growatt SPA TL3 BH-UP
Series rapidly and troubleshooting, build communication system through read this
manual carefully.If you have any questions in the process of installation, you can login in
www.growatt.com and leave some message.Or you can call our 24-hour service
86 0755 2747 1942.
Growatt SPA TL3 BH-UP Series is used to store energy generated from grid if it is allowed
in the battery, also energy can be sent to power grid through SPA TL3 BH-UP for self
consumption or when Grid power is lost, SPA TL3 BH-UP can be used as backup power.
SPA series has six kinds of type:
Ÿ
SPA 4000TL3 BH-UP
Ÿ
SPA 5000TL3 BH-UP
Ÿ
SPA 6000TL3 BH-UP
Ÿ
SPA 7000TL3 BH-UP
Ÿ
SPA 8000TL3 BH-UP
Ÿ
SPA 10000TL3 BH-UP
Note: we describe this series as “SPA” as below.
Overview:
Chart 1.1
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
Position
Description
LED of status display
LCD screen
Function button
Ground point
Breathable valve
EPS output(off grid connection)
RSD(do not open except by Professional staff)
AC Grid (on grid connection)
Rs485 communication interface(Reserved)
Rs485 communication interface of meter2(Reserved)
NTC: Lead-acid temperature sensor terminal
Rj45 interface of DRMs(used only in Australia)
Rs485 communication interface of meter1
CAN communication interface of Lithium battery
USB interface
Battery terminal
Dry contact
Rs485 communication interface of meter2(Reserved)
AC
coupled
P
Q
R