51
52
12
Decommissioning
•
•Waiting until LED and LCD display have gone out, the SPA is shut down completely.
Turn the switch off in turn of Grid and battery.
Watch out the SPA's shell heat and prevent to scald.
Wait 20 minutes until the SPA cooling and then to disassembly!
•
•Unscrew the radiator and wall-mounted anchor screw and then take down the
machine from wall.
Unscrew all the connecting cable.
12.1 Dismantling the energy storage
12.2 Packing the SPA
inverter
12.3 Storing SPA
inverter
12.4 Disposing of the SPA inverter
Usually placed SPA inverter in the packing box with tape sealing, If the SPA inverter
cannot reoccupy, You can choose a cheap carton for packaging. Carton requirements
must meet the size of the inverter and can support energy storage machine overall
weight.
Store SPA series in a dry place where ambient temperatures are always between -25°C
and +60°C.
Do not dispose of SPA inverter together with household waste. Please
accordance with the disposal regulations for electronic waste which
apply at the installation site at that time.
Ensure that the old unit and, where applicable, any accessories are
disposed of in a proper manner.
Product specification
13
13.1 SPA
series
energy
stroage
machine
product
specification
SPA 1000TL
BL
SPA 2000TL
BL
SPA 3000TL
BL
Output Data(AC)
AC nominal power
1000W
2000W
3000W
Max. AC apparent power
1000VA
2000VA
3000VA
Nominal AC voltage (range)
230V (180V-270V)
AC grid frequency (range)
50Hz / 60Hz (±5Hz)
Max output current
6A
10A
16A
Power factor(@nominal power)
1
Adjustable power factor
0.8leading…0.8 lagging
THDi(nominal power)
<3%
AC connection
Single phase
Input Data(AC)
AC nominal
1000W
2000W
3000W
Max. AC apparent power
1000VA
2000VA
3000VA
Nominal AC voltage (range)
230V (180V-270V)
AC grid frequency (range)
50Hz / 60Hz (±5Hz)
Max input current
6A
10A
16A
Power factor(@nominal power)
1
Adjustable power factor
0.8leading…0.8 lagging
Model
Specifiction