6
.
1
6
.
2
Operation modes
6
.
3
Country setting
6
.
4
Display and button
6.5 Communication
Commissioning of SPH
11.1 Dismantling the energy storage
11.2 Packing the SPH inverter
11.3 Storing SPH inverter
11.4 Disposing of theSPH inverter
14.1
storage machine product specification
14.2 DC input terminal parameter
14.3 Torque
14.4 Appendix
Growatt SPH series energy
11
Decommissioning
6
Commissioning
12
Product specification
7
.
1
Start-up the SPH system
7
.
2
Disconnect
the
SPH system
7
system
Start-up and shut down
SPH
13
Certificate
14 Contact
9
Fault removal
8
Attention of the installation
environment, maintenance
and cleaning
10 EU Declaration of Conformity