background image

4

3

2

 

Safety

2

.

1

 

 Use

Purpose

1.4 Safety Instructions

1.Please be clear which kind of battery system you want, lithium battery system or lead-
acid battery system, if you choose the wrong system, SPH can't work normally.
2.Please read this manual carefully before the installation, The company has the right not 
to quality assurance,If not according to the instructions of this manual for installation 
and cause equipment damage.
3.All the operation and connection please professional electrical or mechanical engineer.
4.During installation, Please don't touch the other parts within the box.
5.All the electrical installation must comply with the local electrical safety standards.
6.If equipments needs to maintain, Please contact with local specify system installation 
and maintenance personnel.
7.Use the equipment to combined to grid needs to obtain the permission of local power 
supply department.
8.When install PV modules in the daytime, please turn off the PV switch, Otherwise it will 
be dangerous as high terminal voltage of modules in the sunshine.

The system chart of SPH:

Chart 2.1

As shown above, a complete grid-connected system of SPH consists of PV modules, SPH 
inverter, battery, utility grid and other components. 

Attention:

As the system refer to battery use, We must make sure ventilation of the service 

environment and temperature control in order to prevent the danger of battery 

explosion, Battery recommended installation environment must be strictly in accordance 

with the specification

if the specification is IP20 environment, the pollution degree of 

the unit is PD2, meanwhile the temperature should be control in the 0-40

 of indoor 

ventilation and the humidity should be 5%-85%. If the chosen PV modules needs to 
positive or negative ground connection, please contact with Growatt for technical 
support before installation.

2.2 Safety Measure

Risk of high voltage

Relevant operation for professional personnel.

Please notice children, disabled, laypeople do not close.

Supervise and make sure children don't play near the installation position of energy 

storage machine.

Risk of burns on the parts shell of SPH inverter

During the work, Cover, shell around, radiator is likely to be hot.

SPH inverter exists radiation maybe affect health

Don't stay a long time within 20cm range from SPH inverter.

Please ensure SPH inverter ground connection is reliable for make sure people's safety.

SPH inverter ground connection

DANGER

DANGER

CAUTION

2.3 Symbols introduction on the SPH inverter

Symbol

Description

Caution: Risk of electrical shock!

Caution : hot surface!

Electic meter

10m

5m

AC
Breaker

 

Breaker

DC
Breaker

AC
Breaker

 

Sensor

Load

PV Array

Battery

EPS

Grid

Electrical Grid

ATS-T

Hybrid

Hybrid

Hybrid Inverter

L1
L2
L3

N

RailLog

Electic meter

L1
L2
L3

N

1

2

5m

Load

EPS

Summary of Contents for SPH 10000TL3 BH

Page 1: ...an Street Bao an District Shenzhen P R China No 28 Guangming Road Shiyan Street Bao an District Shenzhen P R China GR UM 158 A 00 GR UM 158 A 00 86 0755 2747 1942 86 0755 2747 1942 www ginverter com w...

Page 2: ...ty Measure 2 3 Symbols introduction on the SPH inverter Purpose Use 1 1 Preface 1 2 Target Group 1 3 Product Description 1 4 Safety Instructions 3 Product Description 4 Unpacking 5 Installation 5 1 5...

Page 3: ...ter 14 1 storage machine product specification 14 2 DC input terminal parameter 14 3 Torque 14 4 Appendix Growatt SPH series energy 11 Decommissioning 6 Commissioning 12 Product specification 7 1 Star...

Page 4: ...Installer can install energy storage machine of Growatt SPH TL3 BH Series rapidly and troubleshooting build communication system through read this manual carefully If you have any questions in the pro...

Page 5: ...tilation of the service environment and temperature control in order to prevent the danger of battery explosion Battery recommended installation environment must be strictly in accordance with the spe...

Page 6: ...ating 3 2 Label Explanation Label contains the following information for example SPH 10000TL3 BH shows as below Caution risk of danger Danger to life due to high voltage in SPH There is residual volta...

Page 7: ...ers Safety level Ingress Protection Operation Ambient Temperature Certificates Number Growatt SPH 10000TL3 BH 1000Vdc 160 1000Vdc 15A 2 12A 2 10000W 10000VA 3W N PE 230 400Vac 15 2A 50Hz 60Hz 0 8 lead...

Page 8: ...setscrew Ground terminal M4 setscrew Mc4 connector black connector Installation 5 5 1 Basic installation requirements A The installation location must be suitable for SPH s weight for a long period ti...

Page 9: ...space into account about the dimensions please reference user manual N The Inflammable and explosive dangerous goods must not be placed around battery in case of cause serious danger 5 2 Installation...

Page 10: ...board installation guide put the cardboard on the wall and make sure the top edge of the cardboard is horizontal 3 Mark four points at the wall via the hole of the paper board then remove the cardboar...

Page 11: ...not connect to DC source 5 4 2 Connection of AC terminal and off grid terminal SPH has a grid output terminal and off grid out terminal look down on the SPH from the front the terminal on the left on...

Page 12: ...inal and EPS output terminal connection steps as follow Step 1 Uninstall the AC terminal as below chart Step 2 Thread cables through pressure screw seal ring threaded sleeve in sequence insert cables...

Page 13: ...d storage system Notice If you want to use on gird only please refer to chart 5 17 Connect with AC grid and float EPS OUTPUT If you have no battery now you can also float BAT terminal and this hybrid...

Page 14: ...must be larger than 12AWG 5 4 4 Connection of meter terminal When customer needs to use meter to monitor the energy flow the meter terminal connection steps are as follows Step1 Reference 5 2 make LAN...

Page 15: ...the filler plug from the cable support sleeve Step5 Route the CAN cable through an opening in the cable support sleeve Step6 Thread the CAN cable through the cable gland Step7 Insert the RJ45 plug of...

Page 16: ...d lock the waterproof cover to the inverter with screws Step9 Screw the swivel nut onto the waterproof cover 5 4 7 Connection of DRMS terminal Australia only When SPH is applied to Australia the DRMS...

Page 17: ...on the inverter until it snaps into place Step8 If no other cables need to be installed lock the waterproof cover to the inverter with screws Step9 Screw the swivel nut onto the waterproof cover PIN...

Page 18: ...the cable such as Dry contact cable is not used please do not remove the filler plug from the cable support sleeve 5 4 10 Grounding connection SPH must be grounded by cable the grounding point is show...

Page 19: ...rge battery by PV power as large as it can do If the customer enables the AC CHG AC grid charging functions Inverter will charge battery by PV power and AC power from grid as large as it can do Grid f...

Page 20: ...d Each small white PIN has two statuses when set upward to ON its value turns to 1 when set downward its value turns to 0 Concerning the matching of the PIN status and the country safety standard plea...

Page 21: ...XXXXB GT0XXXXXXC GT0XXXXXXD GT0XXXXXXE GT0XXXXXXF GT1XXXXXX0 6 5 4 3 2 1 ON DIP 6 5 4 3 2 1 ON DIP 6 5 4 3 2 1 ON DIP 6 5 4 3 2 1 ON DIP TAIWAN EN50549 Ireland India Brazil GT1XXXXXX2 GT1XXXXXX3 GT1XX...

Page 22: ...Fault Location Description A B D C E Status ESC button cancel control Down button Enter button UP button Notice LED showing status of SPH it has two colors one is green and another is red Please turn...

Page 23: ...Mode Ppv xxxx xxxxW PV1 PV2 voltage Battery information WorkMode Grid_R xxxV xxHz WorkMode EPS_R xxxV xxHz WorkMode Po xx xkW GridS information Output AC Power EPS R information WorkMode Pbat XXXX W B...

Page 24: ...Power Rate 100 Power Rate 100 Priority WorkMode WorkMode Opt Load First WorkMode WorkMode WorkMode AC CHG Enable WorkMode SC _ _ _ _ WorkMode 00 00 00 00 WorkMode Save OK WorkMode Time WorkMode 00 00...

Page 25: ...we can quickly update the software of machine You can see USB A as below Note USB is only used for firmware update Customer can t use it for charging 6 5 2 Use of RS232 port RS232 port is mainly used...

Page 26: ...Before use WIFI communication you should make sure the follow PIN1 and PIN2 are ON Start up and shut down SPH system 7 7 1 Start up the SPH system Users can start up SPH inverters through following st...

Page 27: ...rature output after temperature back to normal system can work normally please be patient at this time If the temperature is too low it is possible that battery will be low temperature protection at t...

Page 28: ...is lost or not 2 Check the grid connection is good or not 3 Check the switches on the cable are on or not 1 Restart inverter 2 Please contact Growatt service center if restart can t solve the problem...

Page 29: ...3 Shenzhen Growatt New Energy Technology Co Ltd confirms that the Growatt inverters and accessories described in this document are in compliance with the above mentioned EU directives The entire EU De...

Page 30: ...A 15A 15A 15A 15A 15A 15A 15A 15A 15A 15A 15A 4000W 6000W 8000W 5000W 7000W 10000W 4000VA 5000VA 6000VA 7000VA 8000VA 10000VA 230V 400V 310 476V 50 60Hz 45 55Hz 55 65 Hz 6 1A 7 6A 9 1A 10 6A 12 1A 15...

Page 31: ...system voltage IP68 0 25m model 1000V DC UL 1000V DC TUV 32A 40A 44A 65A 55 56 12 3 Torque 12 4 Appendix The following chart is the energy storage machine optional appendix list if there is a need pl...

Page 32: ...ion code 5 SPH inverter Display content 6 The manufacturer and model of the battery 7 Battery capacity and connection mode Annex AutoTest only for Italy Follow is the chart of Auto Test refer to 6 4 4...

Reviews: